Checking the balanced flue system for soundness (annular
gap check)
A
Combustion air aperture
For balanced flue systems tested
together with the gas fired wall
mounted boiler, some Federal States
(e.g. Northrhein-Westphalia) waive
the requirement for a soundness test
(overpressure test) during commis-
sioning by the flue gas inspector.
For such cases we recommend that
your heating contractor carries out a
simple soundness test during the
initial start-up of your system. For
this, it would be sufficient to check the
CO
2
concentration in the combustion
air at the annular gap in the balanced
flue pipe.
The flue pipe is deemed to be sound,
if the CO
2
concentration of the com-
bustion air is no higher than 0.2 % or
the O
2
concentration is at least
20.6 %.
If actual CO
2
values are higher or O
2
values are lower, carry out a pressure
test on the flue pipe at a static pres-
sure of 200 Pa.
Further details regarding the individual steps
(cont.)
17
Initial start-up, inspection, maintenance
56
92
550
GB
Содержание VITODENS 300 WB3A
Страница 10: ...Opening the control unit housing 10 5862 570 GB...
Страница 14: ...Closing control unit housing and inserting user interface 14 5862 570 GB...
Страница 122: ...Temperature profile Factory set code F1 6 to F1 15 Control functions cont 106 Function description 5692 550 GB...
Страница 125: ...A1 Main PCB A2 Mains supply unit Connection and wiring diagrams external connections 109 Designs 5692 550 GB...
Страница 129: ...Parts lists cont 113 Parts lists 5692 550 GB...
Страница 130: ...Parts lists cont 114 Parts lists 5692 550 GB...
Страница 131: ...Parts lists cont 115 Parts lists 5692 550 GB...
Страница 132: ...Parts lists cont 116 Parts lists 5692 550 GB...
Страница 133: ...Parts lists cont 117 Parts lists 5692 550 GB...
Страница 145: ...129 5692 550 GB...
Страница 146: ...130 5692 550 GB...
Страница 147: ...131 5692 550 GB...