3.
Set the upper rated output.
Turn rotary selector "
tr
" less than
3 seconds clockwise to the end
stop, then back again into the cor-
rect control range.
4.
Check the CO
2
content. Should the
actual value deviate by more than
1% from the above range, check
the seals in the balanced flue sys-
tem.
5.
Enter actual values into the service
report.
6.
Select the lower rated output.
Turn rotary selector "
tr
" to the
left control range.
7.
Check the CO
2
content. Should the
actual value deviate by more than
1 % from the above range, check
the seals in the balanced flue sys-
tem.
8.
Enter actual values into the service
report.
9.
Once checked, turn the rotary
selector "
tr
" less than 3 s to the
right to the end-stop and back
again into the control range.
Note
The process will automatically end
after 30 minutes
Commissioning and testing
(cont.)
54
Installation
58
62
670
GB
Содержание Vitodens 100
Страница 41: ...Opening the control unit housing Electrical connections 41 Installation 5862 670 GB Installation ...
Страница 82: ...A1 Main PCB A2 Programming unit Connection and wiring diagrams combi boiler 82 Designs 5862 670 GB ...
Страница 84: ...A1 Main PCB A2 Programming unit Connection and wiring diagram system boiler 84 Designs 5862 670 GB ...
Страница 88: ...Parts lists cont 88 Parts lists 5862 670 GB ...
Страница 89: ...Parts lists cont 89 Parts lists 5862 670 GB Service ...
Страница 90: ...Parts lists cont 90 Parts lists 5862 670 GB ...
Страница 91: ...Parts lists cont 91 Parts lists 5862 670 GB Service ...
Страница 95: ...95 5862 670 GB ...