8.
Install in reverse order using new
gaskets.
Note
Ensure that fixing holes and seals
are aligned. Install the heat plate
exchanger the correct way round.
Checking the fuse
1.
Switch OFF the mains power.
2.
Flip down control unit.
3.
Remove cover
A
.
4.
Check fuse F1.
Repairs
(cont.)
81
Troubleshooting
58
62
670
GB
Service
Содержание Vitodens 100
Страница 41: ...Opening the control unit housing Electrical connections 41 Installation 5862 670 GB Installation ...
Страница 82: ...A1 Main PCB A2 Programming unit Connection and wiring diagrams combi boiler 82 Designs 5862 670 GB ...
Страница 84: ...A1 Main PCB A2 Programming unit Connection and wiring diagram system boiler 84 Designs 5862 670 GB ...
Страница 88: ...Parts lists cont 88 Parts lists 5862 670 GB ...
Страница 89: ...Parts lists cont 89 Parts lists 5862 670 GB Service ...
Страница 90: ...Parts lists cont 90 Parts lists 5862 670 GB ...
Страница 91: ...Parts lists cont 91 Parts lists 5862 670 GB Service ...
Страница 95: ...95 5862 670 GB ...