8.
Turn temperature gauge controls to
the desired operating position.
Note: Be aware thath the boiler
may still need to be vented as air
pockets are drawn into the heat
exchanger.
9.
Turn rotary knobs "
tr
" and "
tw
"
into control range again.
Filling the Domestic Hot Water Circuit (Combi boiler only)
1.
Open the DHW inlet valve
A
and
outlet valve
B
.
2.
Open all DHW taps in turn to vent
any air from the DHW pipework.
Checking static and supply pressure
Danger
CO formation, as a result of incorrect burner adjustment,can lead to
severe health problems.
Carry out a CO test prior to, and after, work on gas equipment.
Commissioning and testing
(cont.)
51
Installation
58
62
670
GB
Installation
Содержание Vitodens 100
Страница 41: ...Opening the control unit housing Electrical connections 41 Installation 5862 670 GB Installation ...
Страница 82: ...A1 Main PCB A2 Programming unit Connection and wiring diagrams combi boiler 82 Designs 5862 670 GB ...
Страница 84: ...A1 Main PCB A2 Programming unit Connection and wiring diagram system boiler 84 Designs 5862 670 GB ...
Страница 88: ...Parts lists cont 88 Parts lists 5862 670 GB ...
Страница 89: ...Parts lists cont 89 Parts lists 5862 670 GB Service ...
Страница 90: ...Parts lists cont 90 Parts lists 5862 670 GB ...
Страница 91: ...Parts lists cont 91 Parts lists 5862 670 GB Service ...
Страница 95: ...95 5862 670 GB ...