1.
Remove the screw at the top of the
boiler.
2.
Press down the springs on the
underside of the boiler and remove
the front panel.
3.
Lift the front panel from the wall
mounting frame.
Burner removal
1.
Switch OFF the mains power.
2.
Close the gas shut-off valve and
safeguard against reopening.
3.
Pull electrical cables from fan
motor
A
, gas train
B
, and ignition
unit
E
.
4.
Remove connection hose from air
pressure switch
D
.
Routine Servicing Instructions
(cont.)
59
Service Instructions
58
62
670
GB
Service
Содержание Vitodens 100
Страница 41: ...Opening the control unit housing Electrical connections 41 Installation 5862 670 GB Installation ...
Страница 82: ...A1 Main PCB A2 Programming unit Connection and wiring diagrams combi boiler 82 Designs 5862 670 GB ...
Страница 84: ...A1 Main PCB A2 Programming unit Connection and wiring diagram system boiler 84 Designs 5862 670 GB ...
Страница 88: ...Parts lists cont 88 Parts lists 5862 670 GB ...
Страница 89: ...Parts lists cont 89 Parts lists 5862 670 GB Service ...
Страница 90: ...Parts lists cont 90 Parts lists 5862 670 GB ...
Страница 91: ...Parts lists cont 91 Parts lists 5862 670 GB Service ...
Страница 95: ...95 5862 670 GB ...