50
A
1.
Connect a flue gas analyser at flue
gas port
A
on the boiler flue con-
nection.
2.
Open the gas shut-off valve, start the
boiler and create a heat demand.
3.
Set the lower heating output (see
page 50).
4.
Check the CO
2
content. Should the
actual value deviate from the afore-
mentioned ranges by more than 1 %,
implement steps from page 49.
5.
Enter actual values into the report.
6.
Select the upper output (see
page 50).
7.
Check the CO
2
content. Should the
actual value deviate from the afore-
mentioned ranges by more than 1 %,
implement steps from page 49.
8.
After testing, press
OK
.
9.
Enter actual values into the report.
Select higher/lower heating output
Weather-compensated control unit
Constant temperature control unit
Service menu
1. Press
OK
and
å
simultaneously for
approx. 4 s.
2.
"Actuator test"
3. Select the lower heating output:
Select
"Base load OFF"
. Then
"Base
load ON"
appears and the burner op-
erates at its lower heating output.
4. Select the upper heating output:
Select
"Full load OFF"
. Then
"Full
load ON"
appears and the burner op-
erates at its upper heating output.
5. Ending output selection:
Press
ä
.
Service menu
1. Press
OK
and
å
simultaneously for
approx. 4 s.
2. Select " " with
Ú
and confirm with
OK
.
The display shows "
I
" and
"ON"
flash-
es.
3. Select the lower heating output:
Press
OK
,
"ON"
will be displayed con-
stantly.
4. Select the upper heating output:
Press
ä
.
5. Select
"2"
with
Ú
,
"ON"
flashes.
6. Press
OK
,
"ON"
will be displayed con-
stantly.
7. Ending output selection:
Press
ä
.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5623 520 GB
Содержание Series B2HA 40
Страница 16: ...16 3 2 2x 1 4 4x 5 Installation sequence Opening the control unit casing cont 5623 520 GB ...
Страница 172: ...172 0002 0001 0003 0005 0004 Parts lists Miscellaneous cont 5623 520 GB ...
Страница 178: ...178 5623 520 GB ...
Страница 179: ...179 5623 520 GB ...