26
Routing the connecting cables
!
Please note
If connecting cables touch hot components they will be damaged.
When routing and securing connecting cables on site, ensure that the maxi-
mum permissible temperatures for these cables are not exceeded.
5
A
Low voltage connections
B
230 V connections
C
Internal extension
D
Main PCB
E
Communication module
F
Cable grommet for power cable
%
Plugs for connecting the cylinder
temperature sensor to the cable har-
ness
Remove the existing cable grommet
when using larger cross-sections (up to
7
14 mm). Secure the cable with the
cable grommet plugged into the lower
casing section
F
(black).
Installation sequence
Electrical connections
(cont.)
5623 520 GB
Содержание Series B2HA 40
Страница 16: ...16 3 2 2x 1 4 4x 5 Installation sequence Opening the control unit casing cont 5623 520 GB ...
Страница 172: ...172 0002 0001 0003 0005 0004 Parts lists Miscellaneous cont 5623 520 GB ...
Страница 178: ...178 5623 520 GB ...
Страница 179: ...179 5623 520 GB ...