38
yes
Ignition
no
Fault EE
Check the ignition
module (control
voltage 230 V
across plugs
"X2.1" and "X2.2")
yes
Gas train opens
no
Fault EE
Check the gas train
(control voltage
230 V); check the
gas supply pres-
sure
yes
Ionisation current
builds
Symbol
A
no
Fault EE
Check the ionisa-
tion electrode ad-
justment and the
gas line for air-
locks
yes
Burner in opera-
tion
no
Stops below the
set boiler water
temperature and
restarts immedi-
ately
Check the flue gas
system for tight-
ness (flue gas re-
circulation), check
the gas flow pres-
sure
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5623 520 GB
Содержание Series B2HA 40
Страница 16: ...16 3 2 2x 1 4 4x 5 Installation sequence Opening the control unit casing cont 5623 520 GB ...
Страница 172: ...172 0002 0001 0003 0005 0004 Parts lists Miscellaneous cont 5623 520 GB ...
Страница 178: ...178 5623 520 GB ...
Страница 179: ...179 5623 520 GB ...