11
A
C
D
E F
B
1.
2.
5x
Fig. 3
A
Heating flow
B
Expansion vessel connection
C
Cylinder flow
D
Cylinder return
E
Heating return
F
Filling/draining
Flue gas connection
Note
The "System certificate" and "Skoberne GmbH flue
system" labels enclosed with the technical documenta-
tion may only be used in conjunction with the
Viessmann flue system made by Skoberne.
Note
Ensure the boiler is horizontally and vertically aligned
when mounting on the wall.
Connect the balanced flue system to the boiler flue
connection.
Note
If a balanced flue system with
7
60/100 mm is to be
connected, a balanced flue adaptor (accessories) is
required.
Flue system installation instructions.
Installation sequence
Mounting the boiler and making connections
(cont.)
5686 293 GB
Installation
Содержание J3HA
Страница 10: ...10 2x 1 2 4 3 Fig 2 Installation sequence Mounting the boiler and making connections 5686 293 GB Installation ...
Страница 21: ...21 2 3 2x 1 Fig 14 Installation sequence Fitting the front panel 5686 293 GB Installation ...
Страница 78: ...78 Troubleshooting Maintenance cont 5686 293 GB Diagnosis ...
Страница 90: ...90 0004 0006 0005 0003 0001 0002 Fig 51 Parts lists Miscellaneous assembly 5686 293 GB Components ...
Страница 114: ...114 5686 293 GB ...
Страница 115: ...115 5686 293 GB ...