22
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
1. Removing the front panel
.................................................................................................. 23
•
2. Filling the heating system
................................................................................................. 23
•
3. Checking the power supply
•
4. Changing the language (if required)
................................................................................. 25
•
•
5. Setting the time and date (if required)
.............................................................................. 25
•
6. Venting the boiler
............................................................................................................... 25
•
7. Venting the heating system
............................................................................................... 26
•
8. Filling the trap with water
.................................................................................................. 26
•
9. Naming the heating circuits
.............................................................................................. 26
•
•
•
10. Function sequence and possible faults
........................................................................... 27
•
11. Adapting the burner to the altitude of the installation location
.................................... 28
•
•
12. Checking the oil preheater installation position
............................................................. 28
•
13. Cleaning the burner
........................................................................................................... 29
•
14. Replacing the nozzle and checking or adjusting the ignition electrodes
..................... 30
•
•
15. Checking the heat exchanger for contamination
............................................................ 31
•
•
16. Cleaning the heat exchanger
............................................................................................ 32
•
•
17. Checking the condensate drain and cleaning the trap
................................................... 32
•
18. Checking the oil supply
..................................................................................................... 33
•
•
19. Checking the vacuum in the oil line
................................................................................. 33
•
•
20. Cleaning and replacing the oil pump filter, if required
.................................................. 34
•
•
•
21. Checking and adjusting combustion quality
................................................................... 34
•
•
22. Adjusting the standard burner settings
........................................................................... 35
•
•
23. Checking the neutralising system (accessories)
............................................................ 35
•
•
24. Checking the active charcoal filter (accessories)
........................................................... 35
•
•
•
25. Checking the expansion vessel and system pressure
•
•
•
26. Checking all connections on the heating water side for leaks
•
•
•
27. Checking the flue system for unrestricted flow and tightness
•
•
•
28. Checking the burner (record values on page 107 of the report)
•
•
•
29. Checking the safety valve function
•
•
•
30. Checking the firm seating of electrical connections
•
31. Matching the control unit to the heating system
........................................................... 36
•
32. Adjusting the heating curves
............................................................................................ 36
•
33. Linking the control unit to the LON
.................................................................................. 38
•
34. Instructing the system user
.............................................................................................. 39
•
35. Scanning and resetting the "Service" display
................................................................. 39
•
•
36. Fitting the front panel
........................................................................................................ 39
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5686 293 GB
Содержание J3HA
Страница 10: ...10 2x 1 2 4 3 Fig 2 Installation sequence Mounting the boiler and making connections 5686 293 GB Installation ...
Страница 21: ...21 2 3 2x 1 Fig 14 Installation sequence Fitting the front panel 5686 293 GB Installation ...
Страница 78: ...78 Troubleshooting Maintenance cont 5686 293 GB Diagnosis ...
Страница 90: ...90 0004 0006 0005 0003 0001 0002 Fig 51 Parts lists Miscellaneous assembly 5686 293 GB Components ...
Страница 114: ...114 5686 293 GB ...
Страница 115: ...115 5686 293 GB ...