4
Disposal of packaging ............................................................................
Maintenance and cleaning .....................................................................
Mounting the boiler and making connections ........................................ 10
Flue gas connection ............................................................................... 11
Condensate connection ......................................................................... 12
Installing the oil supply as a single line system ..................................... 12
Opening the control unit enclosure ........................................................ 13
Electrical connections ............................................................................ 14
.......................................................... 15
External demand via switching contact .............................................. 15
10 V input .................................................... 15
External blocking via switching contact .............................................. 16
Power supply for accessories at plug
(230 V ~) ............................ 17
................................................................................. 18
Routing connecting cables ................................................................. 18
Closing the control unit enclosure and inserting the programming unit . 19
Connecting the fire safety switch (for
only) ..................................... 20
Steps - commissioning, inspection and maintenance ............................ 22
Calling up coding level 1 ..................................................................... 40
Heating circuit 1, heating circuit 2, heating circuit 3 ........................... 44
Calling up coding level 2 ..................................................................... 47
Heating circuit 1, heating circuit 2, heating circuit 3 ........................... 57
Calling up the service level .................................................................... 62
Exiting the service level ...................................................................... 62
Scanning operating data ..................................................................... 62
Weather-compensated control unit ..................................................... 66
Fault codes ............................................................................................ 66
Maintenance .......................................................................................... 72
Checking flue gas temperature sensor ............................................... 74
Checking the temperature limiter ........................................................ 75
Checking the fuse ............................................................................... 76
Index
Index
5686 293 GB
Содержание J3HA
Страница 10: ...10 2x 1 2 4 3 Fig 2 Installation sequence Mounting the boiler and making connections 5686 293 GB Installation ...
Страница 21: ...21 2 3 2x 1 Fig 14 Installation sequence Fitting the front panel 5686 293 GB Installation ...
Страница 78: ...78 Troubleshooting Maintenance cont 5686 293 GB Diagnosis ...
Страница 90: ...90 0004 0006 0005 0003 0001 0002 Fig 51 Parts lists Miscellaneous assembly 5686 293 GB Components ...
Страница 114: ...114 5686 293 GB ...
Страница 115: ...115 5686 293 GB ...