29
1.
Remove nuts from refrigerant con-
nections
C
and
D
and slide onto
the supplied pipe bends.
2.
Flare the pipe ends of the supplied
pipe bends on the short side.
Note
Flare the pipe end of the hot gas line
by approx. 0.5 mm.
3.
Remove the locking caps from the
internal unit connections and secure
the pipe bends with the short side.
Insulate them to provide protection
from heat and vapour diffusion.
Note
■ The long side of the pipe bends
must point upwards.
■ Pipe bends must not be positioned
diagonally. Check the flared con-
nections for firm seating.
4.
Slide the supplied union nuts
(⅝ UNF for liquid line, ⅞ UNF for hot
gas line) over the open end of the
pipe bends.
Installation sequence
Connecting refrigerant lines
(cont.)
5782 201 GB
Installation
Содержание AWT-AC 221.A04
Страница 18: ...18 10 9 11 Installation sequence Installing the internal unit cont 5782 201 GB ...
Страница 20: ...20 2x 4x 6x 4x 22 21 20 19 Installation sequence Installing the internal unit cont 5782 201 GB ...
Страница 88: ...88 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5782 201 GB ...
Страница 102: ...102 0006 0003 0005 0001 0007 0008 0002 0004 0010 0009 Parts lists internal unit Internal unit casing cont 5782 201 GB ...
Страница 155: ...155 5782 201 GB ...