26
C
D
C
D
4.
2.
3.
2x
Example: type AWT-AC 221.A04
C
Liquid line
D
Hot gas line
2.
!
Please note
Contamination (e.g. metal
swarf) or moisture must not
enter the copper pipes.
Therefore, hold the pipe open-
ings downwards or tempora-
rily plug them.
Undo the nuts from connections
C
and
D
on the refrigerant lines (liquid
line and hot gas line).
Type AWT-AC 221.A04
:
Slide the nuts onto the refrigerant
lines prepared on site.
Type AWT-AC 221.A07 to A13,
B10, B13
:
Replace nuts with the supplied union
nuts (internal unit) (⅝ UNF for liquid
line, ⅞ UNF for hot gas line).
3.
Flare the pipe ends.
4.
Secure the pipes.
Installation sequence
Connecting refrigerant lines
(cont.)
5782 201 GB
Содержание AWT-AC 221.A04
Страница 18: ...18 10 9 11 Installation sequence Installing the internal unit cont 5782 201 GB ...
Страница 20: ...20 2x 4x 6x 4x 22 21 20 19 Installation sequence Installing the internal unit cont 5782 201 GB ...
Страница 88: ...88 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5782 201 GB ...
Страница 102: ...102 0006 0003 0005 0001 0007 0008 0002 0004 0010 0009 Parts lists internal unit Internal unit casing cont 5782 201 GB ...
Страница 155: ...155 5782 201 GB ...