53
■ In conjunction with on-site energy con-
sumption (use of power generated by
the PV system to meet own require-
ments):
Note
During the power-OFF period, it is
not possible to operate the compres-
sor with power generated on site.
■ Protect the power supply to the heat
pump control unit with a fuse of 16 A
(max.).
■ For accessories and external compo-
nents that are not connected to the
heat pump control unit, connect the
power supply with the same phase as
the heat pump control unit, ideally
using the same fuse/MCB.
Connection to the same fuse/MCB
provides additional safety when the
power is switched off. Observe the
power consumption of the connected
consumers.
Heat pump control unit power supply (230 V~)
X3
9
16
16
F1 T6,3AH
18
N
L1
8
7
6
N
N
3
1
1
X2
X1
Note
This supply must never be blocked.
■ Max. fuse rating 16 A
■ Standard tariff (no economy tariff with
power-OFF possible)
■ Recommended power cable:
3 x 1.5 mm
2
(5 x 1.5 mm
2
with power-
OFF)
Installation sequence
Power supply
(cont.)
5782 201 GB
Installation
Содержание AWT-AC 221.A04
Страница 18: ...18 10 9 11 Installation sequence Installing the internal unit cont 5782 201 GB ...
Страница 20: ...20 2x 4x 6x 4x 22 21 20 19 Installation sequence Installing the internal unit cont 5782 201 GB ...
Страница 88: ...88 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5782 201 GB ...
Страница 102: ...102 0006 0003 0005 0001 0007 0008 0002 0004 0010 0009 Parts lists internal unit Internal unit casing cont 5782 201 GB ...
Страница 155: ...155 5782 201 GB ...