29
■ In regions with prolonged cold sea-
sons (e.g. in Germany), provide an
electric supplementary heating facility
(accessory) for the condensate pan.
■ For insulation of structure-borne noise
and vibrations between the building
and the external unit, consider the fol-
lowing measures:
– When cable entry is
above
ground
level, fit pipe bends as anti-vibration
mounts in refrigerant lines (see
"Connecting refrigerant lines").
– Route electrical cables/leads
between the internal and external
units free of stress.
– Installation only on walls with high
weight per area (> 250 kg/m
2
), in
other words not on lightweight walls,
roof structures etc.
– When mounting the unit on the floor,
use only the rubber mounts sup-
plied; for wall mounting use the anti-
vibration mounts supplied with the
wall mounting bracket set; never use
additional anti-vibration mounts,
springs, rubber buffers etc.
Weights of the external units
Type
AWB/AWB-AC
Weight in kg
201.B04
43
201.B07
66
201.B10
110
201.B13
110
Installation sequence
Installing the external unit
(cont.)
5604 692 GB
Installation
Содержание AWB 201.B04
Страница 88: ...88 Opening the programming unit 1 3 2 2x Troubleshooting Repairs 5604 692 GB...
Страница 89: ...89 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5604 692 GB Service...
Страница 90: ...90 Placing the control panel in its service position 4x 1 3 2 Troubleshooting Repairs cont 5604 692 GB...
Страница 100: ...100 C B D A Parts lists internal unit Overview of assemblies internal unit 5604 692 GB...
Страница 102: ...102 0001 0005 0006 0004 0002 0008 0003 0007 0008 Parts lists internal unit Casing internal unit cont 5604 692 GB...
Страница 139: ...139 5604 692 GB...