Power-OFF with on-site load disconnection
The power-OFF signal is connected to
the on-site contactor of the economy tar-
iff power supply and to the heat pump
control unit. The compressor
and
instan-
taneous heating water heater (if instal-
led) are "forced" off when power-OFF is
enabled.
Note
Observe the technical connection
requirements of the relevant power sup-
ply utility.
C
B
≈
E
H
3
3
4
4
3
3/N
3/N
G
K
4
kWh
kWh
3
L
D
7
5 (400 V~)
(230 V~)
X3.7
X3.6
A
X40
F
Diagram excluding fuses and RCD
A
Heat pump control unit (internal unit,
luster terminals, see page 45)
B
Instantaneous heating water heater
(if installed)
C
Heat pump compressor (external
unit)
D
Heat pump control unit power sup-
ply (see page 61)
E
Standard tariff meter
F
Backup fuse ripple control receiver
G
Ripple control receiver (contact
open: power-OFF enabled) with
backup fuse
H
Economy tariff meter
K
Feed: TNC system
L
Mains isolator
Installation sequence
Power supply
(cont.)
5604 692 GB
Installation
Содержание AWB 201.B04
Страница 88: ...88 Opening the programming unit 1 3 2 2x Troubleshooting Repairs 5604 692 GB...
Страница 89: ...89 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5604 692 GB Service...
Страница 90: ...90 Placing the control panel in its service position 4x 1 3 2 Troubleshooting Repairs cont 5604 692 GB...
Страница 100: ...100 C B D A Parts lists internal unit Overview of assemblies internal unit 5604 692 GB...
Страница 102: ...102 0001 0005 0006 0004 0002 0008 0003 0007 0008 Parts lists internal unit Casing internal unit cont 5604 692 GB...
Страница 139: ...139 5604 692 GB...