38
2.
!
Please note
Contamination (e.g. metal
swarf) or moisture must not
enter the copper pipes.
Therefore, hold the pipe open-
ings down or plug them.
Undo the nuts from connections
C
(liquid line) and
D
(hot gas line) of
the refrigerant lines.
Type AWB/AWB-AC 201.B04:
Slide the nuts onto the refrigerant
lines prepared on site.
Type AWB/AWB-AC 201.B07,
201.B10, 201.B13:
Replace nuts with union nuts sup-
plied (internal unit) (⅝ UNF for liquid
line, ⅞ UNF for hot gas line).
3.
Flare the pipe ends.
4.
Secure the pipes.
Tighten the nuts with the following torques:
Type
AWB/
AWB-AC
Line
Connection to
external unit
Torque in Nm
201.B04
Liquid line
7
6 mm
⁷
⁄
₁₆
UNF
14–18
Hot gas line
7
12 mm
¾ UNF
50–62
201.B07
Liquid line
7
10 mm
⅝ UNF
33–42
Hot gas line
7
16 mm
⅞ UNF
63–77
201.B10
Liquid line
7
10 mm
⅝ UNF
33–42
Hot gas line
7
16 mm
⅞ UNF
63–77
201.B13
Liquid line
7
10 mm
⅝ UNF
33–42
Hot gas line
7
16 mm
⅞ UNF
63–77
Installation sequence
Connecting the refrigerant lines
(cont.)
5604 692 GB
Содержание AWB 201.B04
Страница 88: ...88 Opening the programming unit 1 3 2 2x Troubleshooting Repairs 5604 692 GB...
Страница 89: ...89 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5604 692 GB Service...
Страница 90: ...90 Placing the control panel in its service position 4x 1 3 2 Troubleshooting Repairs cont 5604 692 GB...
Страница 100: ...100 C B D A Parts lists internal unit Overview of assemblies internal unit 5604 692 GB...
Страница 102: ...102 0001 0005 0006 0004 0002 0008 0003 0007 0008 Parts lists internal unit Casing internal unit cont 5604 692 GB...
Страница 139: ...139 5604 692 GB...