60
Isolators for non-earthed conductors
■ The mains isolator (if installed) must
simultaneously isolate all non-earthed
conductors from the power supply with
a minimum contact separation of 3 mm
■ We additionally recommend installing
an AC/DC-sensitive RCD (RCD class
B
) for DC (fault) currents that
can occur with energy efficient equip-
ment
■ If
no
mains isolator is installed, all non-
earthed conductors must be isolated
from the power supply by the upstream
circuit breakers with at least 3 mm con-
tact separation
Danger
Incorrectly executed electrical
installations can lead to injury
from electrical current and result
in equipment damage.
Make the power supply connec-
tion and implement all protective
measures (e.g. RCD circuit) in
accordance with the following
regulations:
■ IEC 60364-4-41
■ VDE regulations
■ Technical connection require-
ments specified by your local
power supply utility
■ Protect the power supply to the
heat pump control unit with
max. 16 A
Danger
An absence of component earth-
ing in the system can lead to seri-
ous injury from electrical current
if an electrical fault occurs.
Connect the appliance and pipe-
work to the equipotential bonding
of the house in question.
Danger
Incorrect core allocation can
cause severe injury and damage
the appliance.
Never interchange cores "L" and
"N".
■ In negotiations with your power supply
utility, different supply tariffs for the
main power circuits may be offered.
Observe the technical connection
requirements of the power supply util-
ity
■ If the compressor and/or instantane-
ous heating water heater are operated
at an economy tariff (power-OFF),
either provide an additional cable (e.g.
3 x 1.5 mm
2
) for the power-OFF signal
from the distribution board (meter box)
to the heat pump control unit
or
Combine the cable for the power-OFF
signal and for the heat pump control
unit power supply (3 x 1.5 mm
2
) in a 5-
core cable
■ The allocation of the power-OFF (for
compressor and/or instantaneous
heating water heater) is made via the
type of connection and by setting
parameters in the heat pump control
unit.
In Germany, the power supply can be
cut off for up to 3 x 2 hours per day
(24 h)
Installation sequence
Power supply
5604 692 GB
Содержание AWB 201.B04
Страница 88: ...88 Opening the programming unit 1 3 2 2x Troubleshooting Repairs 5604 692 GB...
Страница 89: ...89 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5604 692 GB Service...
Страница 90: ...90 Placing the control panel in its service position 4x 1 3 2 Troubleshooting Repairs cont 5604 692 GB...
Страница 100: ...100 C B D A Parts lists internal unit Overview of assemblies internal unit 5604 692 GB...
Страница 102: ...102 0001 0005 0006 0004 0002 0008 0003 0007 0008 Parts lists internal unit Casing internal unit cont 5604 692 GB...
Страница 139: ...139 5604 692 GB...