2. Precautions
STOP!!! READ THIS BEFORE INSTALLATION
•
Take packing material out o dome and cover off camera
•
Use only 24VAC transformer (2A min)
•
Use proper gauge wiring, (especially for power)
•
Be sure to observe the RS-485 polarity
•
Make sure of the camera setting:
o
Check settings for Pelco-D, 9600 BAUD
(either will not change if energized, must reinitialize)
•
SELECT “TR” (termination resister) to ON only if:
o
For furthest dome away in multiple dome chain, or:
(Note: There can be multiple chains per channel when using a
distribution unit)
o
For Single dome with cable greater than 500ft
Implement proper grounding for over power and lightning protection
2.1. Operating
Before using, make sure power supply and all cables are properly connected.
While operating, if any abnormal condition or malfunction is observed, stop using the
camera immediately and then contact your local dealer.
2.2. Handling
Do not disassemble or tamper with parts inside the camera.
Do not drop or subject the camera to shock and vibration as this can damage camera.
Care must be taken when you clean the clear dome cover. The dome can be easily
scratched.
2.3. Installation and Storage
Do not install the camera in areas of extreme temperature, which exceed the allowable
range.
Avoid installing in humid or dusty places.
Avoid installing in places where radiation is present.
Avoid installing in places where there are strong magnetic fields and electric signals.
Avoid installing in places where the camera would be subject to strong vibrations.
Doc # INS 20/21Z704T-PZ
Issue Date: 03/22/2007
Revision: C
Page
5
of
32