background image

I-VICFLEX.AB1/AB2/AB10_14

REV_R

I-VICFLEX.AB1/AB2/AB10 

/ Victaulic

®

 VicFlex

 Styles AB1/AB2/AB10 Brackets / Installation Instructions

INSTRUCTIONS FOR REASSEMBLY OF A SERIES 

AH1-CC, AH2-CC, OR AH2-CC-300 FLEXIBLE 

HOSE

 WARNING

•  Always verify that the piping system has 

been completely depressurized and drained 
immediately prior to installation, removal, 
adjustment, or maintenance of any Victaulic 
products.

•  Confirm that any equipment, branch lines, or sections of piping 

that may have been isolated for/during testing or due to valve 
closures/positioning are identified, depressurized, and drained 
immediately prior to installation, removal, adjustment, or 
maintenance of any Victaulic products.

Failure to follow this instruction could result in death or serious 
personal injury and property damage.

1.

  Verify that the system is depressurized and drained completely 

before attempting to remove a Series AH1-CC, AH2-CC, or 
AH2-CC-300 Flexible Hose from the sprinkler piping.

2.

  While supporting the Style 108 Coupling, loosen the nut until 

backed off no further than flush with the end of the bolt. Carefully 
remove the flexible hose/coupling assembly from the sprinkler 
piping.

3.

  Fully disassemble the Style 108 Coupling from the inlet end of 

the Series AH1-CC, AH2-CC, or AH2-CC-300 Flexible Hose by 
removing the nut, bolt, gasket, and linkage from the housings. 
Inspect all components for any damage or wear. If any damage or 
wear is present, use a new Victaulic-supplied coupling assembly.

4. 

Verify that the outside surface of the sprinkler piping, between the 
groove and the end of the sprinkler piping, is generally free from 
indentations, projections, weld seam anomalies, and roll marks 
to ensure a leak-tight seal. All oil, grease, loose paint, dirt, and 
cutting particles shall be removed.

 

The sprinkler piping’s outside diameter (“OD”), groove 
dimensions, and maximum allowable flare diameter shall 
be within the tolerances published in current Victaulic IGS 
specifications, publication 25.14, which can be downloaded at 
victaulic.com.

Spacer

Inspect

Inlet End

of Flexible Hose

5. 

Inspect the end of the Series AH1-CC, AH2-CC, or AH2-CC-300 
Flexible Hose to verify that there is no damage (dents, crushed 
edges, etc.). A new, Victaulic-supplied Series AH1-CC, AH2-CC, or 
AH2-CC-300 Flexible Hose shall be used if any damage is present.

6. 

Verify that the spacer is oriented on the inlet end of the Series 
AH1-CC, AH2-CC, or AH2-CC-300 Flexible Hose, as shown above.

 CAUTION

•  A thin coat of a compatible lubricant shall be used to help 

prevent the gasket from pinching, rolling, or tearing during 
reassembly.

•  DO NOT use excessive lubricant on the gasket sealing lips and 

exterior.

Failure to use a compatible lubricant may cause gasket damage, 
resulting in joint leakage and property damage.

7. 

Apply a thin coat of a compatible lubricant, such as Victaulic 
Lubricant or an EPDM-compatible lubricant, to the gasket sealing 
lips and exterior. Silicone grease may be used (silicone spray is not 
a compatible lubricant). It is normal for the gasket to have a hazy 
white appearance after it has been in service.

8. 

Place the lubricated gasket 
onto the inlet end of the 
flexible hose, then place the 
Style 108 Coupling housings 
over the gasket. Verify that 
the gasket is seated fully 
in the gasket pocket of 
each housing and that the 
housings' keys engage with 
the spacer.

9. 

Install the linkage onto the 
housings, as shown to the 
left.

10. 

Install the bolt, and thread a 
nut onto the bolt. 

NOTE:

 Verify that the oval 

neck of the bolt seats 
properly in the bolt hole. 
DO NOT tighten the nut 
completely. The bolt pads 
need to be set at a gap for 
reinstallation of the coupling. 
The nut should be flush with 
the top of the bolt to provide 
the proper gap.

11.

  Follow all steps on page 5.

Содержание VicFlex AB2

Страница 1: ...he use of this product and why it was specified for the particular application The installer shall understand common industry safety standards and potential consequences of improper product installati...

Страница 2: ...sentative is responsible for referencing applicable standards to determine if additional sprinklers or other system adjustments are required The building owner or their representative is responsible f...

Страница 3: ...cket Button Head Cap Screw 7 Hex Socket Button Head Cap Screw Hex Socket Button Head Cap Screw Reference publication 10 85 for listing information Square bar length is in reference to nominal ceiling...

Страница 4: ...ted in the NOTICE below are met a thin coat of a compatible lubricant shall be applied only to the gasket sealing lips to help prevent pinching rolling or tearing during installation DO NOT use excess...

Страница 5: ...Metric nut deep well socket tighten the nut until metal to metal contact occurs at the bolt pads Verify that the oval neck of the bolt seats properly in the bolt hole DO NOT continue to tighten the n...

Страница 6: ...CC AH2 CC or AH2 CC 300 Flexible Hose NO 101 NO 102 5 Insert the inlet end of the Series AH1 CC AH2 CC or AH2 CC 300 Flexible Hose into the No 101 90 Elbow or No 102 Straight Tee Verify that the gaske...

Страница 7: ...thread sealant tape on the threads of the adapter nipple The seal inside the nut of the flexible hose provides the leak proof connection Tighten the connection nut to a torque of 40ft lbs 54N m approx...

Страница 8: ...TM C636 standards Verify that the ends of the Style AB1 AB2 or AB10 Bracket engage the rails Side Facing the Opening of the Center Gate Assembly 1a For center of tile installations align the end brack...

Страница 9: ...nch lbs 6 N m approximately hand tight plus 1 2 to 3 4 of a turn NOTE Verify that the washer is seated under the head of the wing nut 2c FOR STYLE AB2 BRACKETS ONLY Close the gate around the sprinkler...

Страница 10: ...re bar 2 Attach the end brackets of the Style AB2 Bracket to the T bar rails of the CD Profile 60 mm Channel Ceiling System Verify that the ends of the Style AB2 Bracket engage the rails 3 To secure t...

Страница 11: ...TALLATION FOR ASTM C645 METAL JOISTS STUDS INSTALLED IN ACCORDANCE WITH ASTM C754 STANDARDS FM ONLY FOR AB1 AND FM UL FOR AB2 1 Install the flexible hose into the sprinkler piping and the sprinkler re...

Страница 12: ...e of 36 inch lbs 4 N m approximately 1 2 to 3 4 of a turn past hand tight 7 Perform steps 2 2c on pages 8 9 to complete the installation ALTERNATIVE 1 METAL JOIST STUD INSTALLATION FM ONLY FOR AB1 AND...

Страница 13: ...e of 36 inch lbs 4 N m approximately 1 2 to 3 4 of a turn past hand tight 7 Perform steps 2 2c on pages 8 9 to complete the installation ALTERNATIVE 2 METAL JOIST STUD INSTALLATION FM ONLY FOR AB1 AND...

Страница 14: ...be removed The sprinkler piping s outside diameter OD groove dimensions and maximum allowable flare diameter shall be within the tolerances published in current Victaulic IGS specifications publicatio...

Страница 15: ...sponsibility to verify suitability of stainless steel flexible hose for use with the intended fluid media within the piping system and external environment The material specifier shall evaluate the ef...

Страница 16: ...end of a Series AH1 CC Flexible Hose the friction loss data shown above shall be added to the No 101 or No 102 friction loss data published in Victaulic publication 10 54 SERIES AH2 AND AH2 CC FLEXIB...

Страница 17: ...imum Number of 90 Bends AH2 300 31 AH2 CC 300 31 31 790 1 2 17 0 3 DN15 5 2 3 4 16 0 DN20 4 9 AH2 300 36 AH2 CC 300 36 36 915 1 2 25 0 4 DN15 7 6 3 4 22 0 DN20 6 7 AH2 300 48 AH2 CC 300 48 48 1220 1 2...

Страница 18: ...REGIONAL AVAILABILITY ONLY Model Length of Flexible Hose inches mm Outlet Size inches Metric Equivalent Length of 1 inch DN25 Schedule 40 Pipe feet meters Maximum Number of 90 Bends AH4 31 31 790 1 2...

Страница 19: ...nd AB10 Brackets AMF Armstrong Chicago Metallic Dipling Durlum Geipel Gema Armstrong Hilti Knauf Lafarge Lindner Odenwald Richter Rigips Rockfon Pagos Suckow Fischer USG Donn Other manufacturers ceili...

Страница 20: ...9 9 75 3 AH1 72 1830 72 14 26 25 98 46 8 85 2 178 mm 7 inch minimum bend radius Friction loss data is in accordance with GB5135 16 Corresponding flow rate is 113 55 liters per minute 30 gallons per mi...

Отзывы: