8.5   Boiler shut-down  

 

Before the boiler shut-down it is necessary to push out the hot fuel from the combustion chamber on the 

grate and into the ash-pan. This is to be done in manual regime and we do not apply this process in case of 
short-term repairs with operators present.  

 

9.   IMPORTANT NOTES 

 

 

Boiler can only be operated by adult persons who became acquainted with this operation manual. 

 

In case there has occurred the danger of combustible vapours or gases development and their 
penetration into the boiler room or at works with temporarily developed fire or explosion danger 
(floor gluing works, painting works using the flammable paints, etc.), boiler must be shut down 
long enough before the works start. 

 

We check visually the fuel transport into the combustion chamber. There is a danger of injury 
caused by rotating screw shaft. 

 

It is forbidden to use flammable liquids(petrol, oil, heating oil and others) for firing up the 
VIADRUS

 

HERCULES ECO boiler. 

 

Possible combustion process is checked by keeping the door ajar. This method is connected with 
a higher danger of sparks flying out into the boiler room. Immediately after having checked the 
combustion process visually the door must be shut properly.  

 

It is forbidden to overheat the VIADRUS

 

HERCULES ECO boiler in any possible way. 

 

Don’t put ay objects made of flammable material on boiler and within a distance smaller than the 
safe distance from it. 

 

When removing the ashes from boiler there must not be put any flammable materials within 
minimum 1500 mm distance from boiler. The ashes must be collected in non-combustible and 
covered container. 

 

When operating the boilers at the temperature below 60 °C the cast-iron heat exchanger gets 
bedewed which initiates so-called low-temperature corrosion reducing the boiler service life. 
Therefore we recommend to operate boiler at the temperature 60 °C and higher. 

 

After the heating season termination the user is obliged to clean the boiler properly incl. the flue 
gas ducting and the smoke adapter. The graphite grease is to be used for lubrication of swivel 
pins, smoke flap mechanism and other movable parts on boiler. The boiler room must be kept 
clean and dry. 

 

It is forbidden to interfere with boiler structure and electric installation boilers. 

 

WARNING! A poor quality of fuel can markedly negatively affect the boiler output and emission 
parameters

 

 

10.   Maintenance by user 

 

1.)  It is necessary to be particular about a timely fuel refilling. If there is only a small amount of fuel left in the 

reservoir it must be refilled immediately in order to avoid the secondary air suction. Pay a

ttention to a 

correct cover closure on the fuel reservoir

 

!

 

2.)  Remove regularly the ashes from the combustion chamber and the ash-pan drawer. Use the protective 

gloves when discharging the ash-pan drawer. 

3.)  The boiler cleaning frequency depends on the fuel quality. Cleaning must be done in 3 - 4 week intervals 

in case of pellets that don’t exceed 0,5 % ashes. The pellets with ashes content 1,5 % and higher will 
cause that boiler must be checked and cleaned once a week, if need be also more often.. To clean the 
boiler means to remove ashes or deposits from the boiler body (combustion chamber, flue gases ways 
etc.). It is also necessary to check the combustion chamber itself- the combustion air nozzles and 
combustion chamber ceramic arch. Possible deposits must be carefully removed. 

4.)  Above the combustion chamber there are positioned the fireproof ceramic plates.We recommend to 

remove regularly the fly-ash deposited on the plates surface. 

5.)  Minimum 1 hour before cleaning the boiler must be shut down (incl. the electric disconnection). 
6.) We recommend to clean occasionally the 

external

 surfaces of the screw conveyors and ventilator 

drives. (The operators must not remove the covers from 

ventilator or to interfere in any other way 

with these units. This can only do a competent service worker

). Cleaning must be done using a dry 

brush. Boiler when being cleaned must be disconnected from electricity supply.  

7.)  After the cleaning or after any manipulation with fuel reservoir screw feeder please check the correct flex 

hose attachment at both its ends by means of SK tapes.  

8.)  In order to keep a slight overpressure in the combustion chamber during the ventilator operation we pay 

attention to a perfect tightness of boiler (stoking door, ash-pan door, smoke adapter cleaning cover etc.).  

Содержание HERCULES ECO 10

Страница 1: ......

Страница 2: ...tallation 13 6 2 Boiler shells and regulator assembly 14 6 3 Fuel reservoir assembly this part is delivered optionally 15 6 4 Assembly of combustion chamber and the fuel transport lines 16 6 5 Filling...

Страница 3: ...ade name is VIADRUS HERCULES ECO The boiler is manufactured as in warm water design with forced heating water circulation and operating overpressure up to 400 kPa Before dispatch it is checked for tig...

Страница 4: ...4 Fig no 1 VIADRUS HERCULES ECO with fuel reservoir front view left version Fig no 2 VIADRUS HERCULES ECO with fuel reservoir rear view left version...

Страница 5: ...0 1940 x 1405 x 1615 Maximum water operating overpressure kPa 400 Testing water overpressure kPa 800 Heating water minimum temperature C 60 Heating water maximum temperature C 90 Chimney draught Pa 15...

Страница 6: ...an doors the combustion chamber door is behind them The whole boiler drum is insulated by using a health harmless mineral insulation which reduces the heat interchange losses in surroundings The steel...

Страница 7: ...7 Fig no 3 VIADRUS HERCULES ECO boiler dimension dimensions behind the slash apply to 10 sectional size...

Страница 8: ...Central section Boiler insertion Rear section Three figure reservoir Heating water flange Smoke adapter Straight sleeve of the smoke adapter Smoky flap Lever Clearing cover of the smoke Opening for co...

Страница 9: ...hen the building isn t used information about the real and required temperature in the room ATTENTION For boiler control there can only be used the free potential free contact switching voltage is 5 V...

Страница 10: ...ing 1 pc thermomanometer 1 pc logo VIADRUS 1 pc SK strip 70 90 2 pc Heating water flange 1 pc Return water flange 1 pc sealing 90x60x3 mm 2 pc elbow 1 2 1 pc filling and discharging cock 1 2 1 pc clea...

Страница 11: ...test data from reaction to fire tests d to the electrical network SN 33 0165 Electrical regulations Marking the conductors with colours or digits Implementing regulations SN 33 1500 Electrical regula...

Страница 12: ...m The safe distance is to be doubled also in case that the combustibility degree of building material wasn t proved Tab no 2 Combustibility degrees of building materials and products Combustibility de...

Страница 13: ...nd as close as possible to boiler Fig no 6 Positioning of VIADRUS HERCULES ECO boiler in boiler room dimension behind the slash applies to 10 sectional size 6 Boilers assembly 6 1 Boiler drum installa...

Страница 14: ...able 2 m possibly the pump cable and indoor thermostat cable to the regulator Insert the whole into the opening in the middle part of boiler shell upper part after having removed the insulation before...

Страница 15: ...o this whole screw on gradually the side and leg of fuel reservoir 3 Set together in a similar way other 3 vertical walls of fuel reservoir 4 Cover the whole with the fuel reservoir cover Note Alterna...

Страница 16: ...locks Possible leakage can be sealed by sealing cement with resistance up to 1200 C like ZWALUW or heat resisting concrete 4 Through the stoking door insert into the convection part of cast iron heat...

Страница 17: ...rom movement we recommend at the assembly to bore together the ventilator with the sleeve and secure it with a bolt or rivet 7 To carry out the electric interconnection of engines and ventilator with...

Страница 18: ...system must be kept constant When refilling the heating system it has to be prevented from air intake Water from boiler and heating system must never be discharged or taken for usage except for the em...

Страница 19: ...C 6 5 4 8 7 2 1 3 STOP Inhib manual automat Functions on keyb Emergency thermostat 6 max inhib time 7 ventilator drifting setting START automat 1 2 STOP automat 1 ventilator 2 fuel feeder 3 req outle...

Страница 20: ...0 V 2 A ventilator 230 V 2 A circulating pump 230 V 2 A Steady set parameters Pump min 4 ventilator after running s 5 99 conveyor continuous operation min max 10 Automatic operation after inhibition m...

Страница 21: ...X regulator for motors with thermal protection Wiring diagram of RKU 2 for motors with thermal protection Note To the connectors TP motor 1 and 2 thermal overload motor protection no voltage must be b...

Страница 22: ...exceeded the set limit the regulator will shut down the fuel feeder and ventilator until the temperature drops below the set limit with hysteresis 3 C It could happen that this time is too long and th...

Страница 23: ...er Note During the boiler commissioning process and after the regulator has been switched on or occasionally already during the boiler automatic operation there flickers on display the message Er but...

Страница 24: ...t of starling flap of the fan on nr 7 5 85 30 3 8 5 71 25 2 5 9 5 62 20 2 10 5 55 35 3 5 11 5 49 40 4 12 5 44 45 4 5 13 5 40 50 5 14 5 37 50 5 15 5 34 55 5 5 16 5 32 60 6 17 5 29 65 6 5 18 5 27 70 7 1...

Страница 25: ...10 27 80 8 38 10 26 85 8 5 39 10 25 85 8 5 40 10 24 90 9 41 10 24 90 9 42 10 23 95 9 5 0 10 20 30 40 50 60 70 80 90 10 15 20 25 30 35 40 45 50 V kon kotle kW as pro doho v n paliva s Picture nr 20 Boi...

Страница 26: ...ture set on the control thermostat has been achieved the boiler operation will become automatic with set air and fuel supply Then the boiler automatically will pass into inhibition regime where it wil...

Страница 27: ...chanism and other movable parts on boiler The boiler room must be kept clean and dry It is forbidden to interfere with boiler structure and electric installation boilers WARNING A poor quality of fuel...

Страница 28: ...boiler drum 5 years after the date its dispatch from the manufacturing factory The user is obliged to entrust an assembly firm with boiler installation and a special contracting service accredited by...

Страница 29: ...unit EN 13429 2000 NO 3 1 Recovery by material recycling ensure recyclability in all term sof the standard for the functional packaging unit EN 13430 2000 YES 3 2 Recovery in the form of energy ensure...

Страница 30: ...30...

Страница 31: ...31...

Страница 32: ...32...

Страница 33: ...uding the standard accessories and output set according to Operation and installation manual is guaranteed by manufacturer through the contracting service organization The guarantee certificate isn t...

Страница 34: ...34...

Страница 35: ...eness including the standard accessories and output set according to Operation and installation manual is guaranteed by manufacturer through the contracting service organization The guarantee certific...

Страница 36: ...36...

Страница 37: ...including the standard accessories and output set according to Operation and installation manual is guaranteed by manufacturer through the contracting service organization The guarantee certificate is...

Страница 38: ...38...

Страница 39: ...certificate for customer the user Record of accomplished guarantee and after guarantee repairs and regular product checks Record date Carried out activity Contracting service organization stamp signa...

Страница 40: ...40 Date of revision 18 2009 SD GB...