15
Táhlo pro ovládání kou
ř
ové klapky
Podložka 10,5
φ
Pružný kolík
Rukoje
ť
ovládání kou
ř
ové klapky
Spojovací
č
ep
plášt
ě
s matící M5
Pr
ů
chodka Heyco
Pr
ů
chodka Heyco
Konzola plášt
ě
Fig.no.9 Boiler shell side part
6.3 Fuel reservoir assembly
(this part is delivered optionally)
:
1. Screw together the bottoms of fuel reservoir. The bottom of the reservoir must alternate with the fuel
reservoir A. As the joining material serve M6 x 12 screws with nuts and washers.
2. To this whole screw on gradually the side and leg of fuel reservoir.
3. Set together in a similar way other 3 vertical walls of fuel reservoir.
4. Cover the whole with the fuel reservoir cover.
Note.:
Alternatively the rivets can be used as joining material for fuel reservoir assembly.
Fig.no. 10 Fuel reservoir assembly
coupling pin of
the shell with
M5 nut
Heyco bushing
drawbar for smoke flap operation
washer Ø 10,5 diam
spring pin
Heyco bushing
handle for smoke flap operation
shell console
1 – Fuel reservoir side
2 – Fuel reservoir side with the screw hole.
3 – Fuel reservoir leg
4 – Fuel reservoir bottom
5 – Fuel reservoir bottom A
6 – Fuel reservoir cover