WARNING! A poor quality of fuel can markedly negatively affect the boiler output and emission 

parameters 

 
 

4.   Boiler description  

4.1   Boiler drum construction  

 

The main boiler component is the cast iron sectional boiler drum made of grey cast iron according to  

EN 1561. 

¾

  Central sections – quality 150 (previously 

Č

SN 42 2415) 

¾

  Front and rear sections – quality 200 (previously 

Č

SN 42 2420) 

 
The boiler pressure components comply with strength requirements according to: 

EN 303-5   Heating boilers – Part 5: Heating boilers for solid fuele, hand and automatically stocked, 

nominal heat output of up to 300 kW – Terminology, requirements, testing and marking 

 

The boiler drum consists of cast iron sections by means of forced on boiler insertions and is secured 

with anchor bolts. The sections create a combustion chamber and the ash pan space, the water space and 
the convection section. The ash pan space is divided from the combustion chamber through a solid water-
cooled grate.  

Between the combustion chamber and the convection part of heat exchanger there are installed the 

ceramic plates that regulate combustion and influence positively the emission values.  

In the flue gases ducts of the heat exchanger convection part there are inserted the turbulators in order 

to reduce the flue gases temperature thus to increase the boiler efficiency. 

The boiler rear section has in its upper part a smoke adapter and heating water flange (2“), then in lower 

part the return water flange (2“) with a sleeve piece for filling and discharging cocks (G 1/2“). To the front 
section there are mounted the stoking and ash pan doors; the combustion chamber door is behind them.  

The whole boiler drum is insulated by using a health harmless mineral insulation which reduces the heat 

interchange losses in surroundings. The steel boiler shell is treated by applying a good quality powder paint.  

4.2   Construction of combustion chamber and fuel transport lines  

 

The combustion chamber consists of a longitudinal concave drum made of heat-resisting steel to which 

there joins askew from below the piping for fuel supply with a screw conveyer for the combustion chamber. 
This conveyer is also connected with pellets reservoir through another height offset (mismatch) screw 
conveyer which is equipped with regulators functioning in dependence on discharging the combustion 
chamber conveyer. The combustion chamber concave drum which is interconnected with forced air supply is 
equipped with a system of slots in the side walls and in the bottom for the purpose of primary air supply. 

Thanks to a convenient combustion chamber disposition the combustion chamber functional space 

doesn’t get clogged with the combusted material. This after combustion is continually and mechanically 
expelled by the fresh fuel supply. The unburnt fuel will not become clinkered neither will it become attached 
to combustion chamber walls. The combustion is safe. Thanks to the regulated fuel supply and the screw 
conveyer height offset (mismatch)there is excluded the fuel transport lines fire penetration.  

The combustion chamber screw conveyer and the fuel reservoir screw conveyer are mutually 

interconnected through a flex hose.  

Combustion chamber is from above covered by a ceramic arch which directs the flames to the secondary 

air inlets. This results in a better combustion with a significant reduction in light ash particles. 

 
 

Содержание HERCULES ECO 10

Страница 1: ......

Страница 2: ...tallation 13 6 2 Boiler shells and regulator assembly 14 6 3 Fuel reservoir assembly this part is delivered optionally 15 6 4 Assembly of combustion chamber and the fuel transport lines 16 6 5 Filling...

Страница 3: ...ade name is VIADRUS HERCULES ECO The boiler is manufactured as in warm water design with forced heating water circulation and operating overpressure up to 400 kPa Before dispatch it is checked for tig...

Страница 4: ...4 Fig no 1 VIADRUS HERCULES ECO with fuel reservoir front view left version Fig no 2 VIADRUS HERCULES ECO with fuel reservoir rear view left version...

Страница 5: ...0 1940 x 1405 x 1615 Maximum water operating overpressure kPa 400 Testing water overpressure kPa 800 Heating water minimum temperature C 60 Heating water maximum temperature C 90 Chimney draught Pa 15...

Страница 6: ...an doors the combustion chamber door is behind them The whole boiler drum is insulated by using a health harmless mineral insulation which reduces the heat interchange losses in surroundings The steel...

Страница 7: ...7 Fig no 3 VIADRUS HERCULES ECO boiler dimension dimensions behind the slash apply to 10 sectional size...

Страница 8: ...Central section Boiler insertion Rear section Three figure reservoir Heating water flange Smoke adapter Straight sleeve of the smoke adapter Smoky flap Lever Clearing cover of the smoke Opening for co...

Страница 9: ...hen the building isn t used information about the real and required temperature in the room ATTENTION For boiler control there can only be used the free potential free contact switching voltage is 5 V...

Страница 10: ...ing 1 pc thermomanometer 1 pc logo VIADRUS 1 pc SK strip 70 90 2 pc Heating water flange 1 pc Return water flange 1 pc sealing 90x60x3 mm 2 pc elbow 1 2 1 pc filling and discharging cock 1 2 1 pc clea...

Страница 11: ...test data from reaction to fire tests d to the electrical network SN 33 0165 Electrical regulations Marking the conductors with colours or digits Implementing regulations SN 33 1500 Electrical regula...

Страница 12: ...m The safe distance is to be doubled also in case that the combustibility degree of building material wasn t proved Tab no 2 Combustibility degrees of building materials and products Combustibility de...

Страница 13: ...nd as close as possible to boiler Fig no 6 Positioning of VIADRUS HERCULES ECO boiler in boiler room dimension behind the slash applies to 10 sectional size 6 Boilers assembly 6 1 Boiler drum installa...

Страница 14: ...able 2 m possibly the pump cable and indoor thermostat cable to the regulator Insert the whole into the opening in the middle part of boiler shell upper part after having removed the insulation before...

Страница 15: ...o this whole screw on gradually the side and leg of fuel reservoir 3 Set together in a similar way other 3 vertical walls of fuel reservoir 4 Cover the whole with the fuel reservoir cover Note Alterna...

Страница 16: ...locks Possible leakage can be sealed by sealing cement with resistance up to 1200 C like ZWALUW or heat resisting concrete 4 Through the stoking door insert into the convection part of cast iron heat...

Страница 17: ...rom movement we recommend at the assembly to bore together the ventilator with the sleeve and secure it with a bolt or rivet 7 To carry out the electric interconnection of engines and ventilator with...

Страница 18: ...system must be kept constant When refilling the heating system it has to be prevented from air intake Water from boiler and heating system must never be discharged or taken for usage except for the em...

Страница 19: ...C 6 5 4 8 7 2 1 3 STOP Inhib manual automat Functions on keyb Emergency thermostat 6 max inhib time 7 ventilator drifting setting START automat 1 2 STOP automat 1 ventilator 2 fuel feeder 3 req outle...

Страница 20: ...0 V 2 A ventilator 230 V 2 A circulating pump 230 V 2 A Steady set parameters Pump min 4 ventilator after running s 5 99 conveyor continuous operation min max 10 Automatic operation after inhibition m...

Страница 21: ...X regulator for motors with thermal protection Wiring diagram of RKU 2 for motors with thermal protection Note To the connectors TP motor 1 and 2 thermal overload motor protection no voltage must be b...

Страница 22: ...exceeded the set limit the regulator will shut down the fuel feeder and ventilator until the temperature drops below the set limit with hysteresis 3 C It could happen that this time is too long and th...

Страница 23: ...er Note During the boiler commissioning process and after the regulator has been switched on or occasionally already during the boiler automatic operation there flickers on display the message Er but...

Страница 24: ...t of starling flap of the fan on nr 7 5 85 30 3 8 5 71 25 2 5 9 5 62 20 2 10 5 55 35 3 5 11 5 49 40 4 12 5 44 45 4 5 13 5 40 50 5 14 5 37 50 5 15 5 34 55 5 5 16 5 32 60 6 17 5 29 65 6 5 18 5 27 70 7 1...

Страница 25: ...10 27 80 8 38 10 26 85 8 5 39 10 25 85 8 5 40 10 24 90 9 41 10 24 90 9 42 10 23 95 9 5 0 10 20 30 40 50 60 70 80 90 10 15 20 25 30 35 40 45 50 V kon kotle kW as pro doho v n paliva s Picture nr 20 Boi...

Страница 26: ...ture set on the control thermostat has been achieved the boiler operation will become automatic with set air and fuel supply Then the boiler automatically will pass into inhibition regime where it wil...

Страница 27: ...chanism and other movable parts on boiler The boiler room must be kept clean and dry It is forbidden to interfere with boiler structure and electric installation boilers WARNING A poor quality of fuel...

Страница 28: ...boiler drum 5 years after the date its dispatch from the manufacturing factory The user is obliged to entrust an assembly firm with boiler installation and a special contracting service accredited by...

Страница 29: ...unit EN 13429 2000 NO 3 1 Recovery by material recycling ensure recyclability in all term sof the standard for the functional packaging unit EN 13430 2000 YES 3 2 Recovery in the form of energy ensure...

Страница 30: ...30...

Страница 31: ...31...

Страница 32: ...32...

Страница 33: ...uding the standard accessories and output set according to Operation and installation manual is guaranteed by manufacturer through the contracting service organization The guarantee certificate isn t...

Страница 34: ...34...

Страница 35: ...eness including the standard accessories and output set according to Operation and installation manual is guaranteed by manufacturer through the contracting service organization The guarantee certific...

Страница 36: ...36...

Страница 37: ...including the standard accessories and output set according to Operation and installation manual is guaranteed by manufacturer through the contracting service organization The guarantee certificate is...

Страница 38: ...38...

Страница 39: ...certificate for customer the user Record of accomplished guarantee and after guarantee repairs and regular product checks Record date Carried out activity Contracting service organization stamp signa...

Страница 40: ...40 Date of revision 18 2009 SD GB...

Отзывы: