![Vetland EX3000 Скачать руководство пользователя страница 55](http://html.mh-extra.com/html/vetland/ex3000/ex3000_operators-manual_1010097055.webp)
Maintenance
7-7
Post-Maintenance Checkout
After performing maintenance on the EX3000, perform a post-maintenance checkout as described in
Table 7-1.
Table 7-1 EX3000 Post-Maintenance Checkout
Verify
Test Method/ Acceptance Criteria
No pressure leaks
Perform a System Pressure Leak Test in accordance with
Section 6 –
Troubleshooting
.
Proper O
2
flush
button operation
Verify that the button does not stick.
Proper operation of
Inspiration and
Expiration Valves
Visually verify that the valves move freely and do not stick.
Proper operation of
the Pop-Off Valve
Verify that the valve easily opens and closes and does not stick.
Preparing the EX3000 for Storage
1. Turn OFF (
0
) the EX3000 Anesthesia System.
2. Disconnect the main power cable from the facility AC power supply.
3. Turn off the oxygen supply valve and disconnect the facility oxygen supply line (if used). Remove
and safely store E-size stand-mounted oxygen cylinders (if used).
4. Remove and discard disposable breathing tubes and bags in accordance with local regulations.
5. Empty the CO
2
absorber canister and discard the absorbent material in accordance with the
manufacturer’s MSDS and local regulations.
6. Drain both anesthetic agent reservoirs as specified earlier in this section.
7. Clean and disinfect all surfaces and connections as specified earlier in this section.
8. Protect the system from dust and contamination with a plastic cover or other suitable means.
Содержание EX3000
Страница 1: ...P N 410 125 EX3000 Veterinary Anesthesia System Operator s Manual ...
Страница 8: ......
Страница 20: ......
Страница 42: ......
Страница 56: ......
Страница 60: ......
Страница 67: ...Replacement Parts and Accessories 10 3 Figure 10 1 EX3000 Anesthesia System ...
Страница 69: ...Replacement Parts and Accessories 10 5 Figure 10 3 Optional Keyfill Vaporizer Fillers ...
Страница 70: ...10 6 Replacement Parts and Accessories Figure 10 4 410 105A Isoflurane Chamber Assembly ...
Страница 71: ...Replacement Parts and Accessories 10 7 Figure 10 5 410 106A Sevoflurane Chamber Assembly ...
Страница 72: ...10 8 Replacement Parts and Accessories Figure 10 6 410 102A Sub Chassis Assembly ...
Страница 73: ...Replacement Parts and Accessories 10 9 Figure 10 7 410 108A Circuit Board Assembly ...
Страница 74: ...10 10 Replacement Parts and Accessories Figure 10 8 410 100A Back Cover Assembly ...
Страница 75: ...Replacement Parts and Accessories 10 11 Figure 10 9 410 101A DISS Inlet Assembly ...
Страница 76: ...10 12 Replacement Parts and Accessories Figure 10 10 500 100A Pole Assembly ...
Страница 77: ...Replacement Parts and Accessories 10 13 Figure 10 11 510 570A APL Pop off Valve Assembly ...
Страница 78: ...10 14 Replacement Parts and Accessories Figure 10 12 510 103A Manifold Block Assembly ...
Страница 79: ...Replacement Parts and Accessories 10 15 Figure 10 13 510 101A Absorber Canister Assembly ...
Страница 80: ...10 16 Replacement Parts and Accessories Figure 10 14 510 129A Flush Valve Assembly ...
Страница 81: ...Replacement Parts and Accessories 10 17 Figure 10 15 510 104A Inspiration Expiration Valve Assembly ...
Страница 82: ......
Страница 83: ...Appendix A A 1 Appendix Figure A 1 EX3000 Machine Overview Diagram EX3000 Machine Overview Diagram ...
Страница 84: ...A 2 Appendix A Figure A 2 EX3000 Pneumatic Block Diagram EX3000 Pneumatic Block Diagram ...
Страница 85: ...Appendix A A 3 Figure A 3 EX3000 Electrical Block Diagram EX3000 Electrical Block Diagram ...
Страница 86: ...A 4 Appendix A Figure A 4 EX3000 Electrical Connections EX3000 Electrical Connections ...
Страница 87: ......