Horn control
KEY
1
. Battery
2
. Fuse No. 1
3
. Key switch contacts
4
. Fuse No. 4
5
. Horn button
6
. Horn
WARNING
ALL CONTINUITY TESTS MUST BE CARRIED OUT WITH THE CORRESPONDING CONNECTORS
DISCONNECTED.
1) Check fuses No. 1 and 4.
2) Check the key switch and horn button contacts.
3) With the key switch set to «
ON
» and the horn button pressed, check if there is voltage between the
Yellow-Pink cable of the horn device and the ground connection. If there is not, check the cable har-
nesses.
4) Check the horn device ground connection.
Electrical system
Vespa GTS Super 125 i.e. (2009)
ELE SYS - 76
Содержание GTS Super 125 i.e. (2009)
Страница 1: ...MANUALE STAZIONE DI SERVIZIO Vespa GTS Super 125 i e 2009 ...
Страница 4: ......
Страница 6: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Страница 31: ...INDEX OF TOPICS TOOLING TOOL ...
Страница 43: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Страница 53: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL ...
Страница 57: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Страница 87: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Страница 95: ...INDEX OF TOPICS INJECTION INJEC ...
Страница 96: ...Injection Vespa GTS Super 125 i e 2009 INJEC 96 ...
Страница 126: ...Injection Vespa GTS Super 125 i e 2009 INJEC 126 ...
Страница 135: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Страница 159: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Страница 174: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Страница 176: ...4 Expansion tank 5 Radiator 6 coolant temperature sensor Cooling system Vespa GTS Super 125 i e 2009 COOL SYS 176 ...
Страница 177: ...INDEX OF TOPICS CHASSIS CHAS ...
Страница 189: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Страница 193: ...INDEX OF TOPICS TIME TIME ...
Страница 195: ...Crankshaft CRANKSHAFT Code Action Duration 1 001117 Crankshaft Replacement Vespa GTS Super 125 i e 2009 Time TIME 195 ...
Страница 232: ...Stickers TRANSFERS Code Action Duration 1 004159 Plates Stickers Replacement Time Vespa GTS Super 125 i e 2009 TIME 232 ...