![Vertiv NetSure
7100 Series Скачать руководство пользователя страница 184](http://html.mh-extra.com/html/vertiv/netsure-7100-series/netsure-7100-series_installation-manual_1007935184.webp)
Vertiv
|
NetSure 7100 Series -48V DC Power System Installation Manual (IM582127000)
|
Rev. BB
184
Figure 109:
Battery Connections to Optional Battery Busbar Extension Kit P/N 562364 (for system mounted in
an enclosure)
BATTERY BUSBAR
EXTENSION KIT P/N 562364
3/8” Clearance Holes
on 1” Centers
(Customer must supply
additional hardware)
Note: Central Office Ground
should be tied to any point
on the battery return busbar
or battery return extension
busbar.
Power System Installed in a Cabinet
(Front View)
Battery
(Return Side)
Busbar
Battery
(Load Side)
Busbar
GND RTN
-48V
SUPPLY