Vertiv
|
NetSure 502NGFB Installation Manual (Section 6009)
|
Rev. Z
25
Installing Load Distribution Fuses (List KG GMT Load Distribution Fuse Panel)
Procedure
NOTE!
1.
Install distribution fuses. Use only Bussmann GMT type of the rating required for your application.
ALERT!
At +40°C and +65°C ambient, a fuse with a rating of greater than 10 amperes SHALL HAVE an
empty mounting position between it and any other fuse.
2.
If your installation requires dummy fuses in all unused fuse positions, install the dummy fuses (factory
provided).
3.
Ensure that fuse safety covers are installed on each fuse.
Figure 10:
Installing GMT Load Distribution Fuses (List KG)
Installing an Optional Battery Cabinet
NetSure™ 201BC Battery Cabinet, Part No. 541434
Refer to the instructions (Section 6023) supplied with the Battery Cabinet.
NetSure™ 211BC Battery Cabinet, Part No. 545534
Refer to the instructions (Section 6033) supplied with this Battery Cabinet.
NetSure™ 211BC Battery Cabinet, Part No. 545506
Refer to the instructions (Section 6036) supplied with this Battery Cabinet.
NetSure™ 211BC Battery Cabinet, Part No. 554631
Refer to the instructions (UM554631) supplied with this Battery Cabinet.
GMT Fuse
Safety Cover
Содержание NetSure 502NGFB Series
Страница 10: ...Vertiv NetSure 502NGFB Installation Manual Section 6009 Rev Z 10 This page is intentionally blank ...
Страница 37: ...Vertiv NetSure 502NGFB Installation Manual Section 6009 Rev Z 37 Figure 14 Controller RJ 45 Ethernet Port ...
Страница 45: ...Vertiv NetSure 502NGFB Installation Manual Section 6009 Rev Z 45 Figure 20 Battery Connections ...
Страница 85: ...Vertiv NetSure 502NGFB Installation Manual Section 6009 Rev Z 85 This page is intentionally blank ...
Страница 86: ...Vertiv com Vertiv Headquarters 1050 Dearborn Drive Columbus OH 43085 USA Section 6009 RZ 2020 ...