Vertiv
|
NetSure 502NGFB Installation Manual (Section 6009)
|
Rev. Z
21
Installing Circuit Breakers and Fuses
GMT Load Distribution Fuses (List BF and NF)
Procedure
NOTE!
1.
Open the Distribution Unit’s front access panel.
2.
Install correctly sized GMT fuses into the fuse holders located inside the Distribution Unit, as required. If
a dummy fuse is installed, first remove the dummy fuse. Install a safety fuse cover over each GMT fuse.
3.
When finished, close the Distribution Unit’s front access panel.
Figure 6:
Installing GMT Load Distribution Fuses (List BF and NF)
Front
GMT Fuse
Positions
(Max. 15A)
GMT Fuse
Positions
(Max. 10A)
Front access panel
removed in illustration
for clarity.
Содержание NetSure 502NGFB Series
Страница 10: ...Vertiv NetSure 502NGFB Installation Manual Section 6009 Rev Z 10 This page is intentionally blank ...
Страница 37: ...Vertiv NetSure 502NGFB Installation Manual Section 6009 Rev Z 37 Figure 14 Controller RJ 45 Ethernet Port ...
Страница 45: ...Vertiv NetSure 502NGFB Installation Manual Section 6009 Rev Z 45 Figure 20 Battery Connections ...
Страница 85: ...Vertiv NetSure 502NGFB Installation Manual Section 6009 Rev Z 85 This page is intentionally blank ...
Страница 86: ...Vertiv com Vertiv Headquarters 1050 Dearborn Drive Columbus OH 43085 USA Section 6009 RZ 2020 ...