Wire the removable SA Bus terminal block plugs on the ZEC and other field devices in a daisy-chain configuration 
using 4-wire twisted, shielded cable as shown in Figure 3.

Field Controller (FC)

 

Bus Terminal Block

The FC Bus terminal block is a blue, removable, 4-terminal plug that is keyed to only fit in to the board-mounted, 
blue FC Bus jack.

Wire the removable FC Bus terminal block plugs on the ZEC and other FC Bus controllers in a daisy-chain 
configuration using 3-wire twisted, shielded cable, as shown in Figure 4. 

Modular Ports

The modular SA Bus and FC Bus ports on the face of the ZEC are RJ-12 (6-position) modular jacks

.

The modular SA Bus ports provide a connection for the VAV  Balancing Tool. The FC Bus port is not used in ZEC 
installations.

Figure 3: SA Bus Terminal Block Wiring

 Stranded, 4-Wire (2 Twisted Pair) Shielded Cable

(One twisted pair is the   and  leads. 

The second pair is COM and SA PWR.) 

+

 

-

Cable Shield

Connection

To Next

Device on

the SA Bus

F

IG

:s

a

_b

us

_s

pa

d

e

SA Bus

Spade Lugs

Terminating Device

on SA Bus

Daisy Chained Device 

on SA Bus

To Next

Device on

the SA Bus

+

CO

M

PW

R

+

CO

M

PW

R

Figure 4: FC Bus Terminal Block Wiring

SH

IE

LD

CO

M

-

+

Cable Shield

Connection

To Next

Device on

the FC Bus

F

IG

:sa

_

b

u

s_

sp

ad

e

FC Bus

Spade Lugs

Terminating Device

on FC Bus

Daisy Chained Device 

on FC Bus

To Next

Device on

the FC Bus

SH

IE

LD

CO

M

-

+

Figure 5: Pin Number Assignments 

SA and FC Bus Ports

Power
 

 (15 VDC)

SA or FC Bus +

SA or FC Bus 

-

Bus and Power Common 

Power 

(15 VDC)

Bus and Power Common 

F

IG

:r

j1

2

_

p

in

o

u

t

2

3

4

5

6

1

Содержание ZEC410

Страница 1: ...ol system Incorporate and maintain other devices such as supervisory or alarm systems or safety or limit controls intended to warn of or protect against failure or malfunction of the ZEC410 VAV contro...

Страница 2: ...ven surface whenever possible Use shims or washers to mount the ZEC securely and evenly on the mounting surface if necessary Mount the ZEC in an area free of corrosive vapors that matches the ambient...

Страница 3: ...it against the spacer 6 Locate the damper position using the typical marking on the end of the damper shaft Table 1 Verasys System Bus Controller Addressing System Bus Address Range Standalone Verasys...

Страница 4: ...d stop the closed end stop is set by the closed damper For 45 and 60 boxes hard stops must be provided at both full closed and full open damper positions By installing the ZEC controller at the full o...

Страница 5: ...op ration de r glage Veiller ne toucher aucune partie du circuit imprim lorsque celui ci est sous tension Le non respect de ces pr cautions peut provoquer des blessures graves voire mortelles IMPORTA...

Страница 6: ...modular SA Bus ports provide a connection for the VAV Balancing Tool The FC Bus port is not used in ZEC installations Figure 3 SA Bus Terminal Block Wiring Stranded 4 Wire 2 Twisted Pair Shielded Cab...

Страница 7: ...remental outputs for the heating control 2 Wire the network temperature sensor and CO2 sensor to the ZEC s SA Bus 3 Wire the FC Bus in a daisy chain 4 Ensure that the ZEC s device address DIP switches...

Страница 8: ...ZEC410 1 SUPHTG1 C Optional ZN T SA DA ZN CO2 Optional OCC S Optional DA T Optional HTG3 C Optional HTG2 C Optional E C HTG1 C Optional SF C SUPHTG1 C Optional ZN T SA RA DA ZN CO2 Optional OCC S Opt...

Страница 9: ...TAT IS SELECTED 24V COM 24V HOT SA PWR COM TO NEXT DEVICE FRO M LAST DEVICE MS TP MS TP Oc cupancy Sensor O LS 2100 1 CONNECTOR O N BACK OF SENSOR ZONE SENSOR ZN CO2 24V HOT COM SA PWR 24V COM SEE RIS...

Страница 10: ...e zone temperature drops below the unoccupied heating setpoint the supplemental heating coil is fully used before the reheat heat coil enables The damper is at the minimum cfm Unit Enable A network un...

Страница 11: ...ECTOR ON BACK OF SENSOR ZONE SENSOR ZN T IF NETSTAT IS SELECTED 24V COM 24V HOT SA PWR COM TO NEXT DEVICE FROM LAST DEVICE MS TP MS TP TO RE D WIRE OCCUP ANCY S WITCH TO BLACK WIRE OCCUP ANCY S WITCH...

Страница 12: ...ne temperature drops below the unoccupied heating setpoint the supplemental heating coil is fully used before the reheat heat coil enables The damper is at the minimum cfm Unit Enable A network unit e...

Страница 13: ...ONNECTTOAIR FLOWPROBE SF C OPTIONAL DA T DISCHARGEAIRTEMP OPTIONAL 24VHot 24VCom NOTE SUPPLEMENTALVALVESDEFAULTTOA 60 SECONDINCREMENTALACTUATOR THISIS ADJUSTABLEINVERASYS SUPHTG O OPTIONAL CW CCW COM...

Страница 14: ...rily sets the VAV box to Standby mode when the occupancy is not sensed When the box senses occupancy the zone switches back to occupied Standby mode uses standby temperature setpoints that are slightl...

Страница 15: ...than or equal to the intended device address to ON Then continue setting lower numbered switches until the total equals the intended address For example if the intended device address is 21 set Switc...

Страница 16: ...erature sensor 1k ohm nickel with temperature occupancy button TE 68NT 1N00S Wall temperature sensor 1k ohm nickel with warmer cooler W C adjustment and temperature occupancy pushbutton Zone CO2 Senso...

Страница 17: ...cally at the sensor Refer to the Verasys System User s Guide LIT 12012371 for more information CO2 Demand Controlled Ventilation DCV CO2 DCV ensures high Indoor Air Quality IAQ for the zone by using u...

Страница 18: ...f the bus for testing purposes and test the bus portion connected to the Zone Coordinator Correcting Physical Communication Bus Problems The communication bus is subject to a number of physical factor...

Страница 19: ...50 to 60 Hz Class 2 power supply or Safety Extra Low Voltage SELV at 50 60 Hz 20 VAC minimum Power Consumption 10 VA 14 VA maximum Ambient Conditions Ambient Operating Conditions 0 to 50 C 32 to 122 F...

Отзывы: