Action 3:
Same as Action 1… Press Save or Fiberscope button to confirm or capture screenshot for MPO fiber for the nth fiber.
MPO-12 cable completed. All PASS
7. With the MPO cable inspection completed as seen above (e.g. MPO-12 as example), the user will navigate to the
Results
tab and
press
Save
.
RXT1200_Platform_Manual_RevB01
Page 81 of 117
Содержание RXT-1200
Страница 1: ......
Страница 17: ...Go back to TOC RXT1200_Platform_Manual_RevB01 Page 17 of 117...
Страница 76: ...Result tab Tree structure file storage RXT1200_Platform_Manual_RevB01 Page 76 of 117...
Страница 113: ...GNSS Start Menu GNSS Start GNSS Results RXT1200_Platform_Manual_RevB01 Page 113 of 117...