EMR3 Truck Installation
Installation Procedures - Fuel Oil Truck Application
12
Figure 8. Adapter shaft group and groove pin for Tokheim, Daniels, & Donovan
0.51" (12.96 mm)
Groove Pin
(VR#510105-140)-
Factory Installed in
"Top" end of shaft
0.39" ( 9.91 mm)
NOTE DIFFERENCE!
"TOP" End of Shaft Group
(VR#331431-001)
0.126 - 0.128" diameter
through-hole (both ends)
2.615"
(66.42 mm)
emr\tokshft.eps
Содержание EMR3 XStream-PKG
Страница 1: ...Manual No 577013 758 Revision I Installation Guide EMR3 ...
Страница 29: ...EMR3 Truck Installation C C Mode Switch Options 24 Figure 18 Display head cable connections ...
Страница 67: ......
Страница 68: ...For technical support sales or other assistance please visit www veeder com ...