EMR3 Truck Installation
Installation Procedures - Fuel Oil Truck Application
6
Installation Procedures - Fuel Oil Truck Application
Follow the installation procedures below for your particular EMR
3
approved Flow Meter Installation.
LIQUID CONTROLS/TOTAL CONTROL SYSTEMS FLOW METER INSTALLATION
Table 1 lists the parts included in the EMR
3
approved adaptor kit.
INSTALLATION PROCEDURE
1.
Remove and put aside the four mounting bolts holding the meter register assembly to the meter adaptor
mounting flange. Remove the existing mechanical register. Put the bolts aside.
2.
Remove adjuster dust cover plate from front of meter (Figure 2). Remove existing adjuster and coupling shaft.
Notice the type of vertical drive shaft in the meter (Figure 3).
If vertical drive shaft has a hex with pins protruding on opposite sides, slide open end of the kit’s short drive
shaft (P/N
328907-001)
over the Display Head’s encoder shaft and secure with kit’s groove pin (P/N
510162-
001)
. Lower Display Head onto meter, guiding the encoder shaft assembly into meter, then insert the long (P/N
331413-002)
or short (P/N
331413-001)
shaft as required over the pins on the meter’s drive shaft.
If vertical drive is hexagon style, slide the kit’s o-ring (P/N
512700-242)
over the end of the encoder shaft just
past the shaft’s through-hole. Slide the end of the hex shaft (P/N
331955-001)
with the small through-hole over
the encoder shaft and secure with groove pin from kit (P/N
510162-001)
. Slide the o-ring down the encoder
shaft until it seats in the end of the hex shaft. Lower Display Head onto meter, guiding the encoder shaft as-
sembly into meter. As you lower the Display Head, guide the bottom end of the hex coupling over the vertical
drive shaft of the meter.
3.
Replace the adjuster dust cover plate on the front of the meter. Rotate the Display Head on the meter adaptor
mounting flange until the display is facing in the desired direction and check to see that the four meter adaptor
flange mounting holes align with four of the eight tapped (1/4 - 28 UNF-2B threads) mounting holes in the
base of the Display Head’s housing. You may have to rotate the Display Head right or left a little to line up the
four holes. Replace the four mounting bolts and tighten them securely.
4.
If you have the optional temperature probe, remove the existing temperature probe with the mechanical
register and replace it with the Display Head temperature probe.
Table 1.- Display Head-to-Liquid Controls Adaptor Kit 846000-006
Item
Qty
V-R P/N
Wire - Sealing 24” (610 mm) LG
1
011853-285
Shaft - Drive Short L.C.
1
328907-001
Groove Pin - 0.063 D x 0.375
1
510162-001
Coupling - Double End Short
1
331413-001
Coupling - Double End Long
1
331413-002
Sleeve - Hex Coupling Shaft
1
331955-001
O-ring -.145” x .070” W
1
512700-242
Содержание EMR3 XStream-PKG
Страница 1: ...Manual No 577013 758 Revision I Installation Guide EMR3 ...
Страница 29: ...EMR3 Truck Installation C C Mode Switch Options 24 Figure 18 Display head cable connections ...
Страница 67: ......
Страница 68: ...For technical support sales or other assistance please visit www veeder com ...