EMR3 Truck Installation
Installing the Printer (Optional)
35
2.
The thermistor should be verified prior to installation. Reference section “Temperature Measurement and
Calibration” for verification procedure.
3.
If a mechanical (or other) temperature compensator is being replaced, remove the temperature sensing
element for the thermowell.
Mechanical temperature compensation must be disabled or else EMR
3
performance/
calibration will be poor. It is highly recommended that the drywell be full at the time of
probe installation for best results. Use a thermo-conductive liquid such as antifreeze
(ethelene glycol) or any non-freezing thermo-compound.
4.
Install the temperature probe in the thermowell.
A second port may not be available on all meters (which may be required during flow
meter proving). Check with the local inspector prior to flow meter proving.
TEMPERATURE PROBE WIRE DESCRIPTION
To ensure the best operating systems available, Veeder-Root
REQUIRES
the use of shielded cable (P/N
848100-250) when wiring a Temperature Probe (maximum length 50 feet [15.2 m]). In these installations,
shielded cable must be rated less than 100 picofarad per foot and be manufactured with a material suitable for the
environment, such as Belden™ 83552 or equivalent.
Installing the Printer (Optional)
The Epson TM-295 dot matrix slip printer is attached with self-adhesive Velcro strips to a customer supplied
mounting plate or printer stand located somewhere in the truck’s cab.
Veeder-Root recommends that you purchase an off-the-shelf assembly on which to mount the printer. A suggested
vendor for in-vehicle mounting hardware is Signal Measurement Corporation (SMC). You can phone them at (800)
527-1079, or write them at 12519 Wanda Lane, Magnolia, TX 77355, or contact their web site at
www.smc-
corp.com
for pricing or more information.
Depending on your cab type (high cab or low cab) the following SMC printer stand parts should satisfy your
printer mounting needs:
Table 10.- High-Cab Installation*
Item
SMC P/N
Base plate
ZPLT-1
Pillar stack
PS12-A
Swivel stand
VMRU-9
Removable platform
VMI-L0
Содержание EMR3 XStream-PKG
Страница 1: ...Manual No 577013 758 Revision I Installation Guide EMR3 ...
Страница 29: ...EMR3 Truck Installation C C Mode Switch Options 24 Figure 18 Display head cable connections ...
Страница 67: ......
Страница 68: ...For technical support sales or other assistance please visit www veeder com ...