EMR3 Truck Installation
Installation Procedures - Fuel Oil Truck Application
10
TOKHEIM, DANIELS & DONOVAN FLOW METER INSTALLATION
Table 3 lists the parts included in the EMR
3
approved kit. In addition to the “Installation Procedure” on page 6, see
Figure 7 on page 11, Figure 8 on page 12, and Figure 9 on page 13 for instructions on how to disassemble then
reassemble the calibrator.
Table 3.- Display Head-to-Tokheim, Daniels & Donovan Adaptor Kit 846000-004
Item
Qty
V-R P/N
Washer - 0.258 x 0.010 x 0.500
2
011071-325
Wire - Sealing 24” (610 mm) LG
1
011853-285
Coupling - Slot 0.156 W
1
065004-010
Screw - 0.250-28 x 0.62 Hex
4
503615-001
Lockwasher - 0.256 x 0.02
4
510003-006
Groove Pin - 0.125 D x 0.750 T
1
510105-140
Groove Pin - 0.063 D x 0.781 T
1
510105-177
Retaining Ring
2
511810-001
Group - Adapter Shaft
1
331431-001
Содержание EMR3 XStream-PKG
Страница 1: ...Manual No 577013 758 Revision I Installation Guide EMR3 ...
Страница 29: ...EMR3 Truck Installation C C Mode Switch Options 24 Figure 18 Display head cable connections ...
Страница 67: ......
Страница 68: ...For technical support sales or other assistance please visit www veeder com ...