PaX-i
(PCH-2500) Installation Manual
79
4 Installing the Equipment: Floor Standing (Optional)
4.7 Leveling the Equipment
Ensure that the spirit level should rest only on the locations indicated in
the∙following∙figures∙to∙obtain∙the∙accurate∙center.
1.
Prepare the spirit level.
X-ray tube head
Rotating
Unit
2.
Turn the Rotating Unit manually until the
X-ray tube head points forward as shown in
the figure.
3.
Turn the Level Foot on the Base Unit
clockwise with the wrench until the equipment
touches the ground as shown in the
illustration.
Allen
wrench
Содержание Pax-i PCH-2500
Страница 1: ...Installation Manual Full version Model PCH 2500 Version 3 06 English...
Страница 2: ......
Страница 3: ......
Страница 46: ...This page is intentionally left blank...
Страница 82: ...This page is intentionally left blank...
Страница 104: ...This page is intentionally left blank...
Страница 124: ...This page is intentionally left blank...
Страница 166: ...This page is intentionally left blank...
Страница 167: ...Acquiring the Test Image 10...
Страница 169: ...11 Technical Specifications...
Страница 176: ...This page is intentionally left blank...
Страница 179: ...PaX i PCH 2500 Installation Manual 179 Appendix Schematic diagram Components supplied...
Страница 183: ...PaX i PCH 2500 Installation Manual 183 Appendix 2 3M 2 2M 2 1M 2 0M 4 Separate the side cover...
Страница 199: ......
Страница 200: ...Postal code 18449 13 Samsung 1 ro 1 gil Hwaseong si Gyeonggi do Korea www vatech co kr...