![Varta Pulse neo 3 Скачать руководство пользователя страница 92](http://html.mh-extra.com/html/varta/pulse-neo-3/pulse-neo-3_operating-manual_855428092.webp)
Installation
92
Please note:
If the VARTA Link is used
as current sensor, enter the
IP address
of
the
VARTA Link
.
Press
"Connect"
.
The coupled storage system is displayed
in the respective overview.
After coupling of a storage system and
retrieval of the storage system data by the
VARTA pulse neo, the "Cascade monitor"
is displayed.
It provides a full overview of the cascade:
Charging state of the cascade,
the current power,
the max. capacity of the cascade.
If several storage systems are to be
connected, repeat the installation in the
"Cascade manager".
Please note:
Up to 5 devices can be
coupled.
Please note:
Do not forget to complete
the guarantee registration of the energy
storage system in the VARTA portal.
Make sure that the device is connected to
the local network with an active internet
connection.
Содержание Pulse neo 3
Страница 1: ...VARTA STORAGE GMBH OPERATING MANUAL VARTA pulse neo ...
Страница 2: ...Leerseite Pagina vuota Page blanche Blank page ...
Страница 4: ...Leerseite Pagina vuota Page blanche Blank page ...
Страница 29: ...General information 29 VARTA pulse neo front view 1 Nameplate 2 ON OFF button 3 Screw positions ...
Страница 32: ...General information 32 2 4 2 ID label of battery module 2 4 3 Unlock code label ...
Страница 64: ...Installation 64 Three Phase ü Single Phase ü Not permitted û û ...
Страница 67: ...Installation 67 All Dimensions in mm Fig 2 Dimensions at the mounting plate ...
Страница 145: ...Subject to modification Appendix Appendix 1 Connection diagram of TT system ...
Страница 146: ...Subject to modification Appendix 2 Connection diagram of TT system with data logger ...
Страница 147: ...Subject to modification Appendix 3 Connection diagram of TN C system ...
Страница 148: ...Subject to modification Appendix 4 Connection diagram of TN C system with data logger ...