![Varta Pulse neo 3 Скачать руководство пользователя страница 54](http://html.mh-extra.com/html/varta/pulse-neo-3/pulse-neo-3_operating-manual_855428054.webp)
Installation
54
of the energy storage system, refer to
chapter 2.5 "Technical data", page 32.
As necessary, have the statics
checked.
The surface, connected walls and ceilings
must not be made of temperature-
sensitive material.
To enable unobstructed outlet of cooling
air at the device, a minimum side
clearance of 15 cm must be observed.
Over the enclosure, a minimum clearance
height of 30 cm must be provided.
In front of the device, a clearance of
approx. 120 cm in depth is required to
perform installation and servicing at the
front. The screws to open the enclosure
must be accessible from the bottom.
Observe the minimum dimensions
specified in Fig. 2 "Dimensions at the
mounting plate" on page 67.
To escape in case of emergency, the
swivel range of doors must not reach into
this free surface.
Installation dimensions
Installation space
Emergency escape
Содержание Pulse neo 3
Страница 1: ...VARTA STORAGE GMBH OPERATING MANUAL VARTA pulse neo ...
Страница 2: ...Leerseite Pagina vuota Page blanche Blank page ...
Страница 4: ...Leerseite Pagina vuota Page blanche Blank page ...
Страница 29: ...General information 29 VARTA pulse neo front view 1 Nameplate 2 ON OFF button 3 Screw positions ...
Страница 32: ...General information 32 2 4 2 ID label of battery module 2 4 3 Unlock code label ...
Страница 64: ...Installation 64 Three Phase ü Single Phase ü Not permitted û û ...
Страница 67: ...Installation 67 All Dimensions in mm Fig 2 Dimensions at the mounting plate ...
Страница 145: ...Subject to modification Appendix Appendix 1 Connection diagram of TT system ...
Страница 146: ...Subject to modification Appendix 2 Connection diagram of TT system with data logger ...
Страница 147: ...Subject to modification Appendix 3 Connection diagram of TN C system ...
Страница 148: ...Subject to modification Appendix 4 Connection diagram of TN C system with data logger ...