![Varta Pulse neo 3 Скачать руководство пользователя страница 90](http://html.mh-extra.com/html/varta/pulse-neo-3/pulse-neo-3_operating-manual_855428090.webp)
Installation
90
10.9.3.
Battery module registration
In the
second
step, the serial number of
the battery module must be entered. It can
be found on the ID label of battery
module.
Afterwards, select
"Continue".
10.9.4.
Grid parameter configuration
For configuration of grid parameters,
select the respective standard in the
"Country code"
drop-down menu.
Check the values and adjust them as
necessary to the requirements of the local
grid operator.
Afterwards, select
"Continue".
10.9.5.
Function test
To start the automatic status check, select
"Start".
Please note:
This may take a few
minutes.
If everything is in order, a green
checkmark is displayed.
Failed tests are indicated by a red cross.
Please restart the function test.
If the test fails again:
Make sure that the cabling is correct.
Switch off the energy storage system.
The entered data is saved.
Содержание Pulse neo 3
Страница 1: ...VARTA STORAGE GMBH OPERATING MANUAL VARTA pulse neo ...
Страница 2: ...Leerseite Pagina vuota Page blanche Blank page ...
Страница 4: ...Leerseite Pagina vuota Page blanche Blank page ...
Страница 29: ...General information 29 VARTA pulse neo front view 1 Nameplate 2 ON OFF button 3 Screw positions ...
Страница 32: ...General information 32 2 4 2 ID label of battery module 2 4 3 Unlock code label ...
Страница 64: ...Installation 64 Three Phase ü Single Phase ü Not permitted û û ...
Страница 67: ...Installation 67 All Dimensions in mm Fig 2 Dimensions at the mounting plate ...
Страница 145: ...Subject to modification Appendix Appendix 1 Connection diagram of TT system ...
Страница 146: ...Subject to modification Appendix 2 Connection diagram of TT system with data logger ...
Страница 147: ...Subject to modification Appendix 3 Connection diagram of TN C system ...
Страница 148: ...Subject to modification Appendix 4 Connection diagram of TN C system with data logger ...