![Varta Pulse neo 3 Скачать руководство пользователя страница 89](http://html.mh-extra.com/html/varta/pulse-neo-3/pulse-neo-3_operating-manual_855428089.webp)
Installation
89
Software configuration
Initial commissioning is supported by the
internal installation wizard. It is started
automatically when the installer logs in for
the first time.
10.9.1.
Start page of the installation wizard
First, the current sensor configuration
needs to be selected.
Depending on your selection, the energy
storage system is set to the respective
mode (normal operation or cascade).
To continue with configuration:
Check the provided information and
enable the respective options.
Afterwards, select
"Start".
10.9.2.
Basic settings
In the
first
step, the basic settings must be
checked and adjusted as necessary.
Make sure that
date
,
time
and the
time
zone
are configured correctly. The
device
name
can be changed any time.
Afterwards, select
"Continue".
Содержание Pulse neo 3
Страница 1: ...VARTA STORAGE GMBH OPERATING MANUAL VARTA pulse neo ...
Страница 2: ...Leerseite Pagina vuota Page blanche Blank page ...
Страница 4: ...Leerseite Pagina vuota Page blanche Blank page ...
Страница 29: ...General information 29 VARTA pulse neo front view 1 Nameplate 2 ON OFF button 3 Screw positions ...
Страница 32: ...General information 32 2 4 2 ID label of battery module 2 4 3 Unlock code label ...
Страница 64: ...Installation 64 Three Phase ü Single Phase ü Not permitted û û ...
Страница 67: ...Installation 67 All Dimensions in mm Fig 2 Dimensions at the mounting plate ...
Страница 145: ...Subject to modification Appendix Appendix 1 Connection diagram of TT system ...
Страница 146: ...Subject to modification Appendix 2 Connection diagram of TT system with data logger ...
Страница 147: ...Subject to modification Appendix 3 Connection diagram of TN C system ...
Страница 148: ...Subject to modification Appendix 4 Connection diagram of TN C system with data logger ...