![Varta Pulse neo 3 Скачать руководство пользователя страница 65](http://html.mh-extra.com/html/varta/pulse-neo-3/pulse-neo-3_operating-manual_855428065.webp)
Installation
65
PV current sensor (optional)
VARTA pulse neo enables connection of
an additional VARTA Split Core current
sensor for visualisation of the generated
power.
The following conditions must be met:
The phases of the building current
sensor must correspond to the
phases of the PV current sensor.
The arrows on the foldable
transformers must point to the sub-
distribution.
Preparation of installation
Use suitable suspension gear.
WARNING
Components are heavy
They may pose a strain on intervertebral discs
and cause injury due to crushing and
compression.
Any work described in this chapter must
be carried out by 2 persons or with
suitable equipment.
Содержание Pulse neo 3
Страница 1: ...VARTA STORAGE GMBH OPERATING MANUAL VARTA pulse neo ...
Страница 2: ...Leerseite Pagina vuota Page blanche Blank page ...
Страница 4: ...Leerseite Pagina vuota Page blanche Blank page ...
Страница 29: ...General information 29 VARTA pulse neo front view 1 Nameplate 2 ON OFF button 3 Screw positions ...
Страница 32: ...General information 32 2 4 2 ID label of battery module 2 4 3 Unlock code label ...
Страница 64: ...Installation 64 Three Phase ü Single Phase ü Not permitted û û ...
Страница 67: ...Installation 67 All Dimensions in mm Fig 2 Dimensions at the mounting plate ...
Страница 145: ...Subject to modification Appendix Appendix 1 Connection diagram of TT system ...
Страница 146: ...Subject to modification Appendix 2 Connection diagram of TT system with data logger ...
Страница 147: ...Subject to modification Appendix 3 Connection diagram of TN C system ...
Страница 148: ...Subject to modification Appendix 4 Connection diagram of TN C system with data logger ...