![Varta Pulse neo 3 Скачать руководство пользователя страница 66](http://html.mh-extra.com/html/varta/pulse-neo-3/pulse-neo-3_operating-manual_855428066.webp)
Installation
66
Suspension and connection of the energy
storage system
Mark the positions of the top right
and left dill holes according to:
Fig. 2, page 67 (position 1 in the
drawing)
Remove the mounting plate with
the battery inverter from the
drilling position.
Drill both positions and insert the
screw in such a way that a
clearance of approx. 3 mm
remains between the wall and the
screw head.
Remove the carrier lugs at the
mounting plate.
Insert the mounting plate.
Check the vertical position of the
mounting plate.
Mark the other 4 drilling holes
(position
2
in the drawing).
Remove the mounting plate.
Drill the four holes.
Insert the mounting plate.
Firmly
screw the mounting plate
to the wall.
Dimensions in mm
No drilling dust may enter
the device.
Check the position.
Содержание Pulse neo 3
Страница 1: ...VARTA STORAGE GMBH OPERATING MANUAL VARTA pulse neo ...
Страница 2: ...Leerseite Pagina vuota Page blanche Blank page ...
Страница 4: ...Leerseite Pagina vuota Page blanche Blank page ...
Страница 29: ...General information 29 VARTA pulse neo front view 1 Nameplate 2 ON OFF button 3 Screw positions ...
Страница 32: ...General information 32 2 4 2 ID label of battery module 2 4 3 Unlock code label ...
Страница 64: ...Installation 64 Three Phase ü Single Phase ü Not permitted û û ...
Страница 67: ...Installation 67 All Dimensions in mm Fig 2 Dimensions at the mounting plate ...
Страница 145: ...Subject to modification Appendix Appendix 1 Connection diagram of TT system ...
Страница 146: ...Subject to modification Appendix 2 Connection diagram of TT system with data logger ...
Страница 147: ...Subject to modification Appendix 3 Connection diagram of TN C system ...
Страница 148: ...Subject to modification Appendix 4 Connection diagram of TN C system with data logger ...