42PiS-11
RV-12iS
0
01/19/19
PAGE:
REVISION:
DATE:
VAN'S AIRCRAFT, INC.
Step 1: Remove the F-01206E-1 Baggage Floor Cover, previously installed in Section 38iS/U.
Step 2: Cleco the F-00082 ADAHRS Stiffener to the F-01206E-1. Final-Drill #11 the four holes indicated in Figure 1. Disassemble
and debur.
Step 3: Rivet the F-00082 to the F-01206E-1 as shown in Figure 1. This will form the ADAHRS Baggage Floor Assembly.
FIGURE 1: ADAHRS BAGGAGE FLOOR ASSEMBLY
FIGURE 2: INSTALLING THE ADAHRS
Step 4: Bolt the GSU 25 to the ADAHRS Baggage Floor Assembly as shown in Figure 2.
NOTE: See Section 5.27 for detailed fluid fitting assembly instructions.
Step 5: Install the three FLF-00007 fittings into the "Pitot", "AOA", and "Static" ports of the GSU 25 ADAHRS.
5X LP4-3
3X FLF-00007
4X
AN525-10R18
2X NAS1149F0363P
MS21042-3
GSU 25
AFT EDGE OF ADAHRS
BAGGAGE FLOOR ASSEMBLY
AFT EDGE OF
F-01206E-1
F-00082
FINAL-DRILL #11