42PiS-23
RV-12iS
0
01/19/19
PAGE:
REVISION:
DATE:
VAN'S AIRCRAFT, INC.
NOTE: Refer to Figure 1 for all steps on this page.
Step 1: Install the GAD 29 onto the F-01202B-1 using screws, washers, and nuts as shown.
Step 2: Install the IBBS-12V-3AH Back-Up Battery onto the F-01202B-1 using screws, washers, and nuts. Connect the P7211,
P7213, and P7251 ground terminals from the WH-000136 to the corners of the IBBS-12V-3AH as shown.
Step 3: Connect the d-sub connector labeled "XPNDR" and the BNC connector labeled "XPNDR" from the WH-00136 to the
GTX 35R Backplate Assembly as described in the GTX 35R Installation Manual. See the detail view.
Step 4: Install the GTX 35R Backplate Assembly and GTX 35R into the GTX 35R Rack as described in the GTX 35R Installation
Manual.
FIGURE 1: INSTALLING THE GAD 29, GTX 35R, & BACK-UP BATTERY
4X
AN525-10R7
NAS1149F0332P
MS21042-3
GAD 29
4X
IBBS-12V-3AH
F-01202B-1
P7251
GROUND TERMINAL
P7211
P7213
GROUND TERMINALS
GTX 35R
BNC CONNECTOR
"XPNDR"
D-SUB CONNECTOR
"XPNDR"
GTX 35R BACKPLATE
ASSEMBLY
AN525-10R7
NAS1149F0332P
MS21042-3