42PiS-17
RV-12iS
0
01/19/19
PAGE:
REVISION:
DATE:
VAN'S AIRCRAFT, INC.
CLECO
MATCH-DRILL #30
FIGURE 1: PREPARING THE F-01201A-1
NOTE: Check both sides of the firewall for clearance before match-drilling holes to prevent
inadvertent damage.
Step 1: Temporarily remove the Rotax Fuse Box from the forward side of the F-01201A-1 Firewall Top. See
Section 46iS.
Step 2: Temporarily attach the GEA 24 Drill Guide and the F-00132-L Drill Guide to the
F-01201A-1 using screws as shown in Figure 1.
Step 3: Remove the three rivets that will interfere with the F-00132-R. See Figure 1.
Step 4: Cleco the F-00132-R to the F-01201A-1 as shown in Figure 1.
Step 5: Match-drill #30 the holes in the F-00132-R
and the F-00132-L Drill Guide as shown in Figure 1.
Step 6: Match-drill #11 the holes in the
GEA 24 Drill Guide as shown in Figure 1.
Step 7: Remove the F-00132-R and both
drill guides. Discard the two drill guides, but keep
the screws, washers, and nuts.
Step 8: Debur the F-00132-R and
F-01201A-1.
Step 9: Make two ES-000334 Harness
Sheaths from EA HOSE H151 as shown in
Figure 2.
F-00132-R
MATCH-DRILL #30
MATCH-DRILL #30
F-01201A-1
REMOVE EXISTING
RIVETS
3X TEMPORARY #8 SCREWS
F-00132-L DRILL GUIDE
MATCH-DRILL #30
4X TEMPORARY #10 SCREWS
GEA 24 DRILL GUIDE
MATCH-DRILL #11
(CLEARANCE NOTCH)
FIGURE 2: FABRICATING THE ES-00334
EA HOSE H151
SLIT ENTIRE LENGTH,
ONE SIDE