
VANNER POWER GROUP
VANNER POWER GROUP
IQ SERIES
IQ SERIES
IQ SERIES OWNERS MANUAL
- 27 -
•
The AC output test light should be on, indicating the presence of shore power and correct
operation of the AC Transfer switch.
13.
FOR IQC MODELS - Disconnect the AC shore power input. The AC output test light blinks
momentarily, indicating the operation of the Transfer switch connection to connect the AC loads
to the inverter output.
14.
The Inverter LED on the inverter control panel has a solid green light indicating correct inverter
operation. At this point, apply AC loads up to the models rated capacity to verify full-power
operation.
15.
Disconnect all AC loads. The Inverter LED blinks, indicating that the inverter has returned to Load
Demand mode.
16.
FOR IQC MODELS - Determine the correct charger output amps and place the Programming
Switch (#) positions to match this value. Multiple switches can be activated at the same time to
combine values.
For 12-Volt models, the output amps corresponding to the switch positions are:
A
8 Amps
B
16 Amps
C
32 Amps
D
64 Amps
For 24-Volt models, the output amps corresponding to the switch positions are:
A
4 Amps
B
8 Amps
C
16 Amps
D
32 Amps
Determine the combined value of switches that match the desired charger output amps and place
these switches to the ON position. For example, on a 12-Volt system, for a charger output of
approximately 80 Amps, the 64-Amps and 16-Amp switch positions would be ON and the 8-Amp
and 32-Amp switch positions would be OFF.
If the Load Demand function is not appropriate for the intended application, reset the Load
Demand Switch, Programming Switch 2, to the OFF position. This will allow the inverter to be
fully On continuously unless switched off with the On/Off front panel switch or remote control.
Replace front cover of the inverter.
4.2 Procedure to Check Battery Charger Operation
Due to the amount of time to perform this procedure, verifying the battery charger function, it may
be postponed to a convenient time.
To test the battery charger operations, first discharge the battery by placing a large AC load
(approx. 50% of the units rated capacity) on the system and operating the inverter with shore
power off. The AC load will discharge the battery over a time relative to the amount battery
capacity, size of load, and ambient temperature.
Содержание IQ12-2600
Страница 1: ...VANNER POWER GROUP VANNER POWER GROUP IQ SERIES IQ SERIES IQ SERIES OWNERS MANUAL 1...
Страница 2: ...VANNER POWER GROUP VANNER POWER GROUP IQ SERIES IQ SERIES 2 IQ SERIES OWNERS MANUAL...
Страница 43: ...VANNER POWER GROUP VANNER POWER GROUP IQ SERIES IQ SERIES IQ SERIES OWNERS MANUAL 43...
Страница 44: ...VANNER POWER GROUP VANNER POWER GROUP IQ SERIES IQ SERIES 44 IQ SERIES OWNERS MANUAL...