E5 Series High Performance Universal Inverter User’s Manual
12
Chapter 2 Mechanical Installation
Figure T−T Mounting direction and clearance for E5−H−4TTTG T E5−A−4TT5 and above power class
T.3 Removal and Mounting of Operation Panel and Cover
T.3.T Removal and Mounting of Operation Panel
Removal of operation panel
As shown in Figure T−3, the grab on the operation panel forcefully in direction T, and then lift the
panel body in direction T.
Mounting of operation panel
As shown in FigureT−4, align with the lower clamping position of the operation panel in direction T,
and then press down the operation panel in direction T, until the “crack” sound is heard.
Do not mount the operation panel in any other direction; otherwise, the operation panel will have
poor contact.
Figure T−3 Removal of operation panel FigureT−4 Mounting of operation panel
Above 100mm
Above 100mm
Above 100mm
Above 100mm
Air circulation
position
Air circulation
position
Above 200mm
Above 200mm
Air circulation position
Above 200mm
Air circulation position
Above 200mm
Содержание E5 Series
Страница 1: ...E5 Series High Performance Universal Inverter USER S MANUAL E5 Series USER S MANUAL ...
Страница 7: ...vi T Setting Process for Open Loop ...
Страница 8: ...vii Open loop setting process continued ...
Страница 9: ...viii 3 Setting Process for Closed Loop ...
Страница 10: ...ix Setting Process for Closed Loop continued ...
Страница 11: ...x 4 Setting Process for Composite Control ...