PTT-100V Operating Instructions Ver.4.03E
26
DATE <**.**.**>
TIME <**:**:**>
VIU 0001
FILM OFF
VIU 0001
FILM ON
PUSH KEY
PASS or FAIL
ERROR SAMPLE 1
PUSH ENTER KEY
1 : PATTERN 1
10mm/300mm/AUTO
FILM SET 0001
PUSH START KEY
NG 51 MAX LOWER
PUSH SETUP KEY
00 ID: ADMINIST
PASSWORD<000000>
00 ID: ADMINIST
PASSWORD<000000>
VIU Inspection
Peel tensile test
VIU inspection is complete.
PTT test is complete.
After setting the measuring condition, please follow the directions below to perform visual inspection
and peel tensile testing correctly.
With the Inspection Mode 1, the VIU inspection and PTT test can be performed separately.
7 Start testing
7-1 Operation procedure - with inspection mode 1 -
Refer to “9-3 About the Peel
Test Error Display” for the
detail.
Select the desired seal
failure number from 1 to 9.
Select the desired
operation pattern.
ADMIN password will be
required to cancel the error if
logged in as Operator and
ADMIN is activated.
ADMIN password will be
required to cancel the error if
logged in as Operator and
ADMIN is activated.
Attention
Please note that the Operators cannot change the setting when the Administrator ID is
registered and activated
.
Содержание PTT-100 V
Страница 2: ...PTT 100V Operating Instructions Ver 4 03E 2 ...
Страница 6: ...PTT 100V Operating Instructions Ver 4 03E 6 ...
Страница 46: ...46 Rear view Accessories Motor enlarged view 096002D PTT 100V PTT 100V Exploded View ...
Страница 48: ...Y7003 DEC 2017 4th Edition PTT 100V Operating Instructions Ver 4 03E Represented by ...