PTT-100V Operating Instructions Ver.4.03E
37
DAILY INSPECTION
PUSH SET UP KEY
SETTING SPRING
PUSH START KEY
MENU 9
DAILY INSPECTION
The PTT-100V has the function to regularly inspect the peel strength measurement ability. By carrying out
this inspection every day before the testing, the correct performance of the measuring device will be ensured.
3
Remove the grip on the measurement-side as in the
right illustration. Press the
button. The grip
moves to the set up position of the inspection.
4
The below message will be shown on the display.
5
Before pressing the
button, set the tension
spring set jig and tension spring referring to the
following directions.
■
Set tension spring setting jig
Close the lever of the other clamp.
Open the hook and set the jig through the grip jaw.
Close the hook.
1
Access the menu in the right procedure.
2
The display now shows the right screen.
11 <MENU 9> Daily inspection
Grip fixing pin
Load-cell axis
Thin-film grip on the
measurement side
Tension spring setting jig
Catch
Caution
The spring constant may vary due to the secular change. Please take sufficient care to the
preservation environment of the spring.
Attention
The unit display for the daily inspection is fix to “mm, N” regardless of the unit setting set with MENU
2.
Содержание PTT-100 V
Страница 2: ...PTT 100V Operating Instructions Ver 4 03E 2 ...
Страница 6: ...PTT 100V Operating Instructions Ver 4 03E 6 ...
Страница 46: ...46 Rear view Accessories Motor enlarged view 096002D PTT 100V PTT 100V Exploded View ...
Страница 48: ...Y7003 DEC 2017 4th Edition PTT 100V Operating Instructions Ver 4 03E Represented by ...