5-16
Valco Cincinnati, Inc.
Section 5 – Setup
MM125 - D-90 Hot Melt Unit
Ready Delay
Time
When the Ready Delay Time is used, the System Ready LED will illuminate a
preset time after all of the zones reach their respective temperature setpoints
minus the System Ready Temperature Offset. This feature allows the
adhesive in the system to heat for an additional period of time before the
pump motor is enabled.
Once the zones have reached the System Ready Temperature, the time
remaining before the system is ready is displayed on the status bar at the
bottom of the screen.
The ready delay range is 1 minute to 120 minutes. The default factory setting
is ON at 30 minutes
ON at 30 minutes
ON at 30 minutes
ON at 30 minutes
ON at 30 minutes.
To prolong the life of the seal in the pump, this default time of 15 minutes
should not be reduced.
This parameter can be accessed in Password Level 2 or higher (see
Appendix A - Password Levels).
C O N T I N U E D N E X T P A G E
Содержание D-90
Страница 20: ...3 2 ValcoMelton Section 3 Basic Features MM125 D 90 Hot Melt Unit Figure 3 2 Basic Features Overview Continued ...
Страница 22: ...3 4 ValcoMelton Section 3 Basic Features MM125 D 90 Hot Melt Unit Manifold Figure 3 3 Manifold ...
Страница 29: ...4 5 ValcoMelton Section 4 Installation MM125 D 90 Hot Melt Unit Electrical Panel ...
Страница 49: ...5 10 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Set Language Continued ...
Страница 50: ...5 11 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Set Temperature Units ...
Страница 52: ...5 13 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Grid Temperature Hose Valve Temperature ...
Страница 53: ...5 14 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Hose Valve Temperature Continued ...
Страница 56: ...5 17 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Ready Delay Time Continued ...
Страница 61: ...5 22 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Beacon 2 Beacon Alarm Setup Continued ...
Страница 67: ...5 28 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Moving Through the Shift Time Day Screens ...
Страница 73: ...5 34 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Sequential Start Valve ...
Страница 109: ...10 3 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit Overall Assembly Continued 776XX883 01 dwg ...
Страница 112: ...10 6 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit Sheet Metal Assembly 776XX883 03 ...
Страница 113: ...10 7 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit 776XX883 03 Sheet Metal Assembly Continued ...
Страница 114: ...10 8 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit 776XX883 03 Sheet Metal Assembly Continued ...
Страница 125: ...10 19 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit D 90 HMU Electrical Panel Assembly 776XX281 ...
Страница 129: ...10 23 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit D90 Hot Melt Unit EQM0690 EQM0690 01 dwg ...
Страница 136: ...10 30 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit Electrical Panel Assembly EQM0694 dwg ...
Страница 142: ...A 2 ValcoMelton Appendix A Password Levels MM125 D 90 Hot Melt Unit Setting Level 0 as Default Continued ...
Страница 146: ...C 2 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit 240V 3Ø 029XX435 ...
Страница 147: ...C 3 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit 240V 3Ø 029XX435 ...
Страница 148: ...C 4 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...
Страница 149: ...C 5 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...
Страница 150: ...C 6 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...