7-3
Valco Melton
Section 7 – Maintenance
MM125 - D-90 Hot Melt Unit
4.
Use a rag or towel to remove debris buildup on the filter screen,
or replace the screen as follows:
WARNING!
WARNING!
WARNING!
WARNING!
WARNING!
Wear heat-resistant gloves and safety glasses when
performing this procedure.
a. Remove the screw at the bottom.
b. Pull the screen out.
5.
Check the condition of the filter assembly O-rings. Replace them
if necessary (refer to
Section 10 - Part Numbers List).
6.
Insert the clean filter back into the block.
7.
Tighten the filter cap.
Figure 7-2. Replacing the Tank Inlet Filter
Replacing the
Tank Inlet
Filter
The optional tanlk inlet filter should be cleaned or replaced periodically to
prevent adhesive flow restriction, due to debris buildup.
Clean or replace the filter as follows:
1.
Turn the Drum Unloader pump OFF.
CAUTION!
CAUTION!
CAUTION!
CAUTION!
CAUTION!
Make sure the the tank inlet filter block is up to
temperature. Removing the filter while the filter block is
cold could result in damage to seals and the filter
screen.
2.
Open the lid to access the filter cap.
3.
Use a 3/4” wrench to loosen the filter cap, rotating it, slowly,
counter-clockwise.
Содержание D-90
Страница 20: ...3 2 ValcoMelton Section 3 Basic Features MM125 D 90 Hot Melt Unit Figure 3 2 Basic Features Overview Continued ...
Страница 22: ...3 4 ValcoMelton Section 3 Basic Features MM125 D 90 Hot Melt Unit Manifold Figure 3 3 Manifold ...
Страница 29: ...4 5 ValcoMelton Section 4 Installation MM125 D 90 Hot Melt Unit Electrical Panel ...
Страница 49: ...5 10 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Set Language Continued ...
Страница 50: ...5 11 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Set Temperature Units ...
Страница 52: ...5 13 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Grid Temperature Hose Valve Temperature ...
Страница 53: ...5 14 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Hose Valve Temperature Continued ...
Страница 56: ...5 17 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Ready Delay Time Continued ...
Страница 61: ...5 22 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Beacon 2 Beacon Alarm Setup Continued ...
Страница 67: ...5 28 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Moving Through the Shift Time Day Screens ...
Страница 73: ...5 34 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Sequential Start Valve ...
Страница 109: ...10 3 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit Overall Assembly Continued 776XX883 01 dwg ...
Страница 112: ...10 6 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit Sheet Metal Assembly 776XX883 03 ...
Страница 113: ...10 7 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit 776XX883 03 Sheet Metal Assembly Continued ...
Страница 114: ...10 8 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit 776XX883 03 Sheet Metal Assembly Continued ...
Страница 125: ...10 19 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit D 90 HMU Electrical Panel Assembly 776XX281 ...
Страница 129: ...10 23 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit D90 Hot Melt Unit EQM0690 EQM0690 01 dwg ...
Страница 136: ...10 30 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit Electrical Panel Assembly EQM0694 dwg ...
Страница 142: ...A 2 ValcoMelton Appendix A Password Levels MM125 D 90 Hot Melt Unit Setting Level 0 as Default Continued ...
Страница 146: ...C 2 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit 240V 3Ø 029XX435 ...
Страница 147: ...C 3 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit 240V 3Ø 029XX435 ...
Страница 148: ...C 4 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...
Страница 149: ...C 5 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...
Страница 150: ...C 6 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...